Published May 14, 2020 at 8:00 PM

Updated July 3, 2025

Renovation of a water / sewer project in Augusta, Maine. Completed plans call for the renovation of a water / sewer project.

The Contract Documents, consisting of Advertisement for Bids, Information for Bidders, Bid, Bid Bond(5%), Agreement, Payment Bond, Performance Bond, Notice of Award, Notice to Proceed, Change Order, General Conditions, Supplementary Conditions, Drawings, Specifications, and Addenda, may be examined at the following location: Greater Augusta Utility District, 12 Williams Street, Augusta, Maine Copies of the Contract Documents may be obtained at the office of the Greater Augusta Utility District located at 12 Williams Street, Augusta, Maine. The Plans and Specifications may be obtained at the office of the Greater Augusta Utility District, between the hours of 7:00 a.m. and 3:30 p.m. Monday through Friday. Each bid shall be accompanied by a bid security in the amount of not less than 5 percent of the bid price and in the form described in the Information for Bidders. No bidder may withdraw his bid within 60 days, Saturdays, Sundays, and legal holidays excluded after the actual date of the opening thereof unless released by the OWNER. A performance and payment bond each in the amount of 100 percent of the contract price will be required in the form described in the Information for Bidders. The Contractor must comply with all the Safety and Health Regulations, Department of Labor Regulations and Funding Agency Regulations. This project is funded by the State of Maine, Department of Environmental Protection (DEP) Clean Water State Revolving Loan Fund (CWSRF) program. Neither the State of Maine nor any of its departments, agencies, or employees is or will be party to this contract. The word agency is the contract documents refers to the DEP. The contractor must comply with the Disadvantaged Business Enterprises (DBE) SRF special requirements contained in the CWSRF Supplementary Conditions. Failure of the successful bidder to complete the pre award requirements of this program may result in finding that the bidder is non responsible and therefore not entitledto award of this contract. The successful bidder must furnish a complete list of subbidders, if requested by the Engineer. The successful bidder must furnish, within 15 days after the Notice of Award, four sets of signed Contract Documents, 100%Performance Bond, 100% Payment Bond and proof of insurance documentation acceptable to the Owner. The successful bidder must begin execution of this Contract within 10 days following the Notice to Proceed. The contractor must comply with all Federal Requirements and American Iron and Steel per the CWSRF Supplementary Conditions, including submittal of pre award certification regarding Lobbying. The contract or must comply with Davis Bacon (DB) and Davis Bacon Related Acts (DBRA) as stated in the CWSRF Supplementary Conditions. All laborers and mechanics employed by the contractor and subcontractors on this project shall not be paid less than the prevailing wage rates contained in the wage determination published in the bidding documents. Any laborers and mechanics not listed in the wage determination shall be paid at least as much asthe lowest wage rate for other similar trade classifications already contained in the wage determination published in the bidding documents. The District reserves the right to reject any or all Bids, to waive any technical or legal deficiencies, and to accept any Bid that it may deem to be in the best interests of the District.

Award

Water / Sewer

$940,000.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Extinguishing Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
450
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2020

March 2, 2020

img_map_placeholder

33 Jackson Ave, Augusta, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.