Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 25, 2026 at 8:00 PM
Updated May 26, 2026
Site work for a water / sewer project in Augusta, Maine. Working plans call for site work for a water / sewer project.
Maintenance dredging of three portions of the authorized 27-foot deep, 500-foot wide Federal Navigation Project in the lower Kennebec River to support U.S. Navy navigational requirements associated with newly constructed surface combatants built and tested at Bath Iron Works. The work consists of dredging approximately 80,000 cubic yards of clean sand, including approximately 30,000 cubic yards of required material and 50,000 cubic yards of overdepth material. Approximately 61,000 cubic yards will be dredged from the Doubling Point area, approximately 10,000 cubic yards from the Popham Beach area at the river mouth, and approximately 9,000 cubic yards from the Bath Reach area located below the Carlton Bridge and adjacent to Bath Iron Works. Maintenance dredging at Doubling Point includes removal of sand waves to an elevation of -32 feet MLLW plus 2 feet of overdepth to improve the durability of navigational depths. Material dredged from the Bath Reach and Doubling Point areas will be placed in a previously used in-river disposal area north of Bluff Head in water depths of approximately 45 to 90 feet. Material dredged from the Popham Beach area will be placed at the newly established Jackknife Ledge West Disposal Site in nearshore waters approximately 30 to 45 feet deep. All dredging and dredged material placement will be performed using a trailing suction hopper dredge and is expected to be completed within a 3- to 4-week construction period during the allowable work window from 1 December 2026 through 15 February 2027. The estimated construction cost is $1,000,000 to $5,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Water / Sewer
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
To Be Determined, Augusta, ME
Related To This Project
Augusta, ME
Bid Date: Jun 25 2026
Augusta, ME
Bid Date: Jun 18 2026
Augusta, ME
Bid Date: Jun 09 2026
Augusta, ME
Bid Date: May 21 2026
Augusta, ME
Bid Date: May 22 2026
Augusta, ME
Bid Date: Apr 29 2026
Augusta, ME
Bid Date: Apr 24 2026
Augusta, ME
Bid Date: Apr 23 2026
Augusta, ME
Bid Date: Jul 31 2019
Augusta, ME
Bid Date: Nov 16 2021
Augusta, ME
Bid Date: May 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
