Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 1, 2026

Renovation of a military facility in Augusta, Maine. Completed plans call for the renovation of a military facility.

The contractor is required to perform the following installations and integrations on the Ford F-550 vehicle: Equipment Installation: Install all Government-Furnished Equipment (GFE) at specified locations. This includes a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, and various Whelen body, slim, and trio lights. System Integration: Professionally integrate all lighting components with the central controller. All wiring must be routed, secured, protected with grommets where necessary, and concealed appropriately. Power System Installation: Install one Kussmaul battery tender complete with an auto-eject shore power connection to charge the vehicle's batteries. Functional Testing: Conduct a full functional test of the integrated lighting system and the power system in the presence of a Government representative to demonstrate proper functionality. Vehicle Restoration: Upon completion, repair any damage to the vehicle resulting from installation activities and ensure all work areas are cleaned of debris, materials, and tools. Government Furnished Equipment (GFE): The Government will provide the following major components for installation: One (1) Whelen Inner Edge light assembly One (1) Whelen Core and Controller unit Two (2) Whelen slim lights (for front grill) Eight (8) Whelen body lights Two (2) Whelen trio lights Two (2) Whelen slim lights (for front fenders) One (1) Kussmaul battery tender Contractor Requirements: Provide all personnel, equipment, tools, materials (except GFE), and supervision. Ensure all employees possess the required skillsets or licensing to install the lighting system according to manufacturer specifications. The place of performance will be the contractor's installation facility. The period of performance for the installation shall not exceed one week. Period of Performance: The work must be completed within one (1) week from the start date. Questions: May be submitted to the points of contact below.

Award

$7,797.00

Public - Federal

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

October 16, 2026

Project location map

Multiple Locations, Augusta, ME

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed