BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Bangor, Maine. Completed plans call for the renovation of a 10,400-square-foot educational facility.

Notice Content RFQ RFQ #CPPM2026-020 CONSTRUCTION MANAGER AT RISK UMA BANGOR FITNESS CENTER UPGRADE The University of Maine at Augusta is seeking qualifications for Construction Manager at Risk for the following project: UMA BANGOR FITNESS CENTER UPGRADE Submissions will be received until 2:00pm on Thursday, May 7, 2026 Information regarding the Request for Qualifications may be obtained at: https://www.maine.edu/general-services/capital-planning-project-management/ The University of Maine at Augusta, Bangor Campus, seeks qualifications from firms or teams to provide Construction Management at Risk services for the Fitness Center Upgrade project. The Bangor Fitness Center is located at 67 Taft Street, Bangor, Maine, and is approximately 10,400 square feet. The facility includes: o Large gymnasium, 6,582 square feet. o Exercise rooms and offices. o Locker rooms, restrooms, and support spaces. o Storage, utility, and circulation areas. The primary focus of the project is exterior building-envelope repair to address deterioration and prevent further damage. Interior improvements are secondary and will be completed only if enough funding remains after the exterior work is completed. The RFQ states an anticipated project completion in fall 2026 and a projected construction budget of $250,000 to $300,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Exterior work, high priority o Brick masonry repairs, including repointing deteriorated mortar joints and repairing or replacing localized cracked and damaged brick veneer. o Wall assessments, including evaluation of existing weep systems and flashing and repair of dented brick areas near windows. o Canopy remediation, including removal of a severely deteriorated canopy at an unused door followed by wall infill and repair of remaining canopy soffits. o Replacement of one obsolete exterior door. Interior work, budget contingent o Ceiling and lighting upgrades, including replacement of corridor and office ceilings to match the suspended system in the weight room and LED lighting upgrades. o Locker room and restroom upgrades, including evaluation of ventilation in the women's restroom and heating units in locker rooms. o Flooring improvements, including sanding, refinishing, and re-striping the gym floor and possible LVT replacement in reception and corridor areas. o General maintenance, including patching damaged wall surfaces and removing abandoned piping and penetrations. Question Deadline 04/28/2026 at 4:00 PM ET Email questions to cppmquestions@maine.edu

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
31
Bidding Soon
304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 1, 2026

Project location map

67 Taft St, Bangor, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.