Published March 9, 2024 at 7:00 PM

Updated July 3, 2025

Site work for a civil project in Bethel, Maine. Completed plans call for site work for a water / sewer project.

A. The complete Project includes a. The installation of a new valve vault, wet well, and pipe needed to tie into existing force main and existing wet well. The Contractor shall complete all startup and testing protocol. i. Bypass pumping shall be installed from the three manholes which tie into the existing wet well and direct flow to the new wet well. ii. The existing wet well and pumping station shall be repurposed and demolished in accordance with the drawings. The existing wet well will become a sewer manhole directing flow into the new wet well. b. The removal of the existing 6-inch vitrified clay pipe sewer main from Maine State Highway Route 2 in Bethel, Maine starting Spring 2024. c. The installation of a new 8-inch polyvinyl chloride (PVC) pipe sewer main and four sewer manholes in Maine State Highway Route 2 in Bethel, Maine. Mill Hill Pump Station and Route 2 Sewer Main Improvements The Project consists of: The installation of a new pump station and associated appurtenances, tie-in to existing force main and reconstruction / demolition of existing pump station. The removal of the existing 6-inch vitrified clay (VC) pipe sewer main and installation of a new 8-inch polyvinyl chloride (PVC) pipe sewer main and associated appurtenances on Maine State Highway Route 2 in Bethel, Maine. "Agreement Between Owner and Contractor" as follows: 265 calendar days for substantial completion & 295 calendar days for final completion. Bid security shall be furnished in accordance with the Instructions to Bidders. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the BidForm. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

Award

Water / Sewer

$1,337,075.00

Public - City

Site Work

16

32

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
47
Bidding Soon
626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

Project location map

Multiple Locations, Bethel, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.