Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2023 at 8:00 PM

Updated May 15, 2026

Site work and paving for a sidewalk / parking lot in Bridgton, Maine. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

In general, the project consists of construction of approximately 700 linear feet of new bituminous sidewalk, including installation of granite curb, paving and ADA improvements. R1: The Engineers estimated cost for this project is $134,300. The Project is being bid and any bids submitted are subject to the conditions set forth in Section X of the "Municipal Purchasing and Sale of Supplies, Materials, or Equipment Policy" approved 9/22/2015, as amended, and the resulting Contract is subject to the laws of the State of Maine. Construction is expected to begin on April 3, 2023, and be substantially complete no later than June 30, 2023. Any questions concerning the project named should be directed to the following: Hannah Schulz, Woodard & Curran via e-mail @ hschulz@woodardcurran.com. Applicants shall have obtained at least one set of electronic Proposal Documents to be considered a responsive applicant. This project is being partially funded by HUD Community Development Block Grant funds. Davis-Bacon Federal Wage Rates apply to this project, please take notice to the wage rate determination attached to the bid documents. ONLY electronic (PDF) copies of the Bidding Documents may be obtained from the owner's representative, during the hours indicated above or may be requested via e-mail and Dropbox. ONLY electronic (PDF) copies of the Bidding Documents may be obtained from the owners representative, during the hours indicated above or may be requested via e-mail and Dropbox. Request for bid documents should be made via e-mail to Hannah Schulz, EI at hschulz@woodardcurran.com. Any questions concerning the project named above should be directed to the following: Hannah Schulz, Woodard & Curran via e-mail @ hschulz@woodardcurran.com. Applicantsshall have obtained at least one set of electronic or paper Proposal Documents to be considered a responsive applicant.

Award

Sidewalks / Parking Lot

$134,300.00

Public - City

Paving, Site Work

8

7

22

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
42
Bidding Soon
974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2023

April 3, 2023

Project location map

Highland Rd, Bridgton, ME

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed