Site work for a civil project in Brunswick, Maine. Completed plans call for site work for a water / sewer project; and water / sewer project.
The work consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 and 3, including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The scope also includes a new control panel, removal and replacement of two variable frequency drives, installation of two new sine wave filters, a 12-inch raw water flow meter with associated process piping, and a pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work includes demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, plus installation of new power and control conduit and wire. Question Deadline 06/16/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Engineer: Wright-Pierce, B. Address: 11 Bowdoin M ill Island, Suite 140, Topsham, M E 04086 C. Telephone: (207) 798-3716 D. Fax: (207) 729-8414 E. E-mail: dustin.lacombe@wright-pierce.com F. Contact Name: Dustin Lacombe, PE - Project Manager Work Included: Work includes installation of instrumentation, electrical and site work associated with the replacement of a new groundwater well. 1. Site work a. Well 2 & 3 abandonment i. Must be completed by a licensed well contractor ii. Work shall be completed in accordance to the Maine Well Drillers and Pump Installers Rules (144A CMR 232). b. Water main, valves, fittings and other appurtenances to tie in Well 6 c. Site grading d. Loam and seed 2. Process a. Process piping modifications b. Submersible well pump 3. Instrumentation a. New control panel b. Raw water flow meter c. Pressure transmitter assembly d. Well level transmitter e. Furnish and install instruments and equipment noted in Division 13. 4. Electrical a. Site underground power/controls conduit and wire, and associated appurtenances to wells from the treatment facility b. Power/control wire and conduit demolition site and building c. New variable frequency drives for Well 5 and Well 6 d. Furnish and install all other equipment noted in Division 16. 5. Startup, testing, and commissioning of the new equipment including demonstration of all process equipment, instrumentation, and controls functionality. 6. All related site work including trench excavation, groundwater dewatering, disposal of excess excavated materials, filter fabric, bedding, backfill, compaction, road/drive subbase, paving, load/seed and landscaping, chain linked fence and gates. 7. Other miscellaneous work shown in the Specifications for a complete and operational system. B. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard. 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment.
Sub-Bidding
Water / Sewer
$600,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2026
July 23, 2026
421 River Rd, Brunswick, ME
Related To This Project
Brunswick, ME
Bid Date: Jun 18 2026
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: May 18 2026
Brunswick, ME
--
Brunswick, ME
Bid Date: May 13 2026
Brunswick, ME
--
Brunswick, ME
Bid Date: Jun 16 2026
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: Apr 23 2026
Brunswick, ME
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.