BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated July 3, 2025

Site work for a mixed-use development in Camden, Maine. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Camden Hills State Park Water System Upgrades, (BGS 3464) in Camden, Maine. Questions and comments on the bid opening process shall be addressed to: Joseph H. Ostwald, Director, Division of Planning, Design & Construction, Bureau of General Services, 77 State House Station, Augusta, Maine 04333-0077, BGS.Architect@Maine.gov. Question Deadline 05/17/2024 at 5:00 PM ET Questions and comments regarding the project design specifications or drawings shall be directed in writing to the Consultant during the bid period prior to the question and comment deadline Haley Ward, Inc. Chip Haskell, P.E. chaskell@haleyward.com The Work shall generally consist of water system upgrades at Camden Hills State Park in Camden, Maine, including installation of new water storage tanks, demolition of existing storage cistern, installation of new water distribution mains with related valves and appurtenances, installation of new conduits for Data and Telecommunications, selective demolition of the existing wellhouse, and construction of a new wellhouse with associated MEP systems. The Work shall be completed in two (2) phases as follows: Phase I: This Phase shall consist of the installation of new water storage tanks and installation of new infrastructure along the access road to the maintenance and storage facilities. The proposed water storage tanks shall be placed on a new concrete pad, disinfected, and temporarily connected to the existing water main. The temporary connection shall include moving necessary controls from the existing storage cistern to the new tanks. The water manifold may be constructed, but only the piping from the bottom of the tanks shall be used during the temporary connection in order to bring the water tanks into service. This Phase shall also include the installation of new water main, valves, hydrants, and other water infrastructure appurtenances as well as the installation of new data conduits, pull boxes, and other appurtenances along the access road to the maintenance and storage facilities. This length of new infrastructure shall be capped with a valve on the water line and shall be connected to the new distribution main in Phase II. See the Drawings for highlighted portions of the Work corresponding to Phase I. Phase II: This Phase shall consist of the installation of new water distribution mains with related valves and appurtenances, installation of new data conduits and pull boxes, removal of the existing water storage cistern, selective demolition of the existing wellhouse, and construction of a new wellhouse with associated MEP systems as highlighted and detailed on the Drawings corresponding to Phase II and to complete the remaining portions of the Work.

Bid Results

Water / Sewer

$1,122,000.00

Public - State/Provincial

Site Work

26

23

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
23
Bidding Soon
459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 29, 2024

Project location map

280 Belfast Rd, Camden, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.