BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Falmouth, Maine. Completed plans call for site work for a water / sewer project.

The Town of Falmouth Public Works Department seeks qualified contractors to satisfactorily complete the rehabilitation of approximately 1,266 linear feet (LF) of storm drain varying in size from 12" to 30" diameter. The rehabilitation must be done by Ultra-Violet (UV) cured-in-placed lining as specified in both the contract and technical specifications. The work shall also consist of cleaning approximately 70 LF of storm drain, separate from the pipes to be lined. Install approximately 1,266 linear feet of UV Cured-In-Place pipe liner according to the attached technical specifications. o Inspection: The interior of the pipeline to be restored shall be inspected to locate all damage and/or obstructions which would prohibit correct installation of the new liner. A post-installation video (CCTV) inspection shall be provided to the Town. Cost associated with inspections are considered incidental to the lining of the pipe. o All available previous inspections are included as an attachment to this RFP. Pipe segment 1433 was not inspected because it needs cleaning before an inspection can be completed. A picture of this segment is provided in this RFP. The cost of precleaning to prepare for the CIP liner shall be considered incidental to the Install Cured-In-Place Liner bid item. o Obstruction Removal: The Contractor shall repair or remove from the line all obstructions (e.g. sediments, bricks, roots, joint obstructions, etc.), which can prohibit insertion of the pipe. All roots or other obstructions shall be cut flush with the wall of the pipe to be restored, and the debris will be removed from the line. If there is an obstruction that cannot be removed by trenchless methods without excavation, the Contractor shall bring it to the attention of the Town Engineer. o Water Access: Permission to use a fire hydrant for water access must be obtained by completing the attached application and submitting it to the Portland Water District for approval. The Portland Water District guidelines for hydrant use are also attached. o Clean two separate 34 LF segments of RCP as shown on the plan. These pipes have heavy sediment accumulation up to approximately one half of the pipe diameter. It is not anticipated to install a CIP liner in these segments, but the condition will be reevaluated after the pipes have been cleaned. o Perform all other incidental as described in the specifications. The project shall be completed no later than June 30th, 2024. Question Deadline 11/27/2023 at 11:00 AM ET All pre-bid correspondence shall be submitted in electronically to Justin Early, Town Engineer, at jearly@falmouthme.org A bid bond is not required for this project. The Town of Falmouth reserves the right to accept or reject any and all bids

Award

Water / Sewer

$158,581.00

Public - City

Site Work

3

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
60
Bidding Soon
1,037
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

December 29, 2023

Project location map

Lunt Rd, Falmouth, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.