BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated July 3, 2025

This is a service / maintenance or supply contract in Farmington, Maine. Contact the soliciting agency for additional information.

Franklin County is seeking qualified electrical contractors to provide fully insured services for the installation of a 3-phase mechanical upgrade, MDP (Main Distribution Panel) panel, disconnect, and redistribution of electrical circuits at the Franklin County Courthouse. This work is essential to ensure the building's electrical systems are upgraded to meet the county's operational needs. The successful contractor will be required to complete this work within the established timeline, adhering to all safety regulations and codes. Scope of Work The contractor shall provide all necessary labor, materials, equipment, and supervision for the following: Installation of a 3-Phase Mechanical Upgrade to meet building power requirements. Installation of a Main Distribution Panel (MDP), including all related components such as circuit breakers, busbars, and wiring. Installation of Disconnect Switches as needed to isolate specific systems and ensure compliance with safety regulations. Redistribution of Circuits to optimize power usage across the building and meet any specific electrical needs required by the County. Coordination and collaboration with relevant building maintenance staff to minimize disruptions to normal operations. The work will require careful scheduling to ensure that the building is never closed during normal business hours. Project Timeline Start Date: The contractor must begin work within 5 weeks from the contract award date. Work Hours: Work will primarily be performed during off-business hours (weekends and holidays) to minimize disruptions to normal operations. However, some work may need to be performed during business hours depending on building needs and safety considerations. Insurance and Compliance The contractor must be fully insured and provide proof of coverage, including general liability, workers' compensation, and any other necessary insurance. All work must comply with local, state, and federal electrical codes and regulations. Proposal Requirements Please include the following in your quotation: 1. Company Profile: Overview of your business, including years in business, experience with similar projects, and references. 2. Detailed Proposal: A breakdown of costs for labor, materials, equipment, and any other expenses associated with the project. 3. Project Timeline: Detailed schedule outlining when the work will start and when it will be completed. 4. Proof of Insurance: Copy of insurance coverage and any necessary bonds. 5. Licensing: Proof of relevant electrical licenses and certifications. 6. Workforce Details: Names and qualifications of the workers who will be performing the work. Proposals will be evaluated based on: Compliance with RFP requirements Experience and qualifications of the contractor. Quality of references Cost-effectiveness. Ability to meet the project timeline. Compliance with insurance and licensing requirements. Franklin County reserves the right to reject any and all proposals. The successful contractor will be required to sign a formal contract.

Post-Bid

Municipal

$100,000.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
21
Bidding Soon
479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 27, 2026

Project location map

To Be Determined, Farmington, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.