BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2024 at 8:00 PM

Updated July 3, 2025

Site work for a bridge / tunnel in Franklin, Maine. Completed plans call for site work for a bridge / tunnel.

As of July 30, 2024, project has been awarded to Eaton Paving & Excavation LLC, with an awarded amount of $15,035.60. 2024 South Bay Road 5 Culverts The Town of Franklin requests bids proposals for the replacement of five (5) culverts on the Franklin end of South Bay Road. The following are the town ways and specifications the Town of Franklin is requesting bids for the replacement of five (5) culverts on the South Bay Road - Franklin end in 2024. All traffic control, safety matters, grinding, cleaning, and all other activities common to paving are the responsibility of the contractor. Culverts - South Bay Road Remove and replace the five sets of existing culverts at the five grade stakes on the Franklin paved end of South Bay Road. Culverts are to be Plastic, Smooth Interior, 18" diameter or larger if required, must be longer than the road bed, rip-rap at both ends. The re-paving will be completed by a separate contractor. The culverts are to be replaced before the scheduling of the town paving. Scope of Services Contractor is responsible for all grinding, cleaning, traffic control, and other safety matters. Contractor shall be responsible for the professional quality, technical accuracy, timely completion, and the coordination of all Services furnished by the Contractor under this Agreement. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in his Services. Deficiencies are defined as willful or negligent acts that distort or falsify the state of the Services developed and provided hereunder, or willful negligent non assignment of personnel or assignment of unqualified personnel to perform the duties hereunder. Approval by Town of services furnished hereunder shall not in any way relieve the Contractor of responsibilities for the technical adequacy of the work. Neither Town's review, approval or acceptance of, nor payment for Services shall be construed to operate as a waiver of any rights under this Agreement or any cause of action arising out of the performance of this Agreement, and the Contractor shall remain liable in accordance with applicable law for all damages to Town caused by the Contractor's willfully negligent performance of any of the Services furnished under this Agreement.

Award

Bridges / Tunnels

$15,036.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
9
Bidding Soon
184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

Project location map

S Bay Rd, Franklin, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.