BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a bridge / tunnel in Gorham, Maine. Completed plans call for site work for a bridge / tunnel.

Bids submitted after this time will not be accepted. Each bidder must submit a single sealed envelope, the outside of which must be clearly marked "Bid for Wilson Road Large Culvert Replacement ". Location The Wilson Road Large Culvert Replacement is located along Wilson Road in Gorham, Maine at the Nason Brook Crossing. Outline of Work The work includes: Replacement of one (1) deteriorating 72" culvert with a 18' Span X 8' Rise X 66' Length Precast Concrete Box Culvert with a simulated streambed material in order to allow for sufficient fish passage through this crossing. The installation of this culvert will include; excavation, installation of culvert and related backfill, gravels, and the removal of a 24" HDPE overflow culvert. The Town of Gorham will be responsible for the base and surface pavements installation. Basis of Award The Town will award the bid to the responsible and responsive bidder who demonstrates the ability to provide the services outlined in this Invitation to Bid and who submits a bid that responds to the various criteria set forth herein, in the best interests and value of the Town. In determining the most advantageous bid, the Town reserves the right to consider the bidder's references, experience of the bidder generally, and past and present experience of the Town with the bidder, in addition to price. Other Information The contract shall make note of the schedule requirements presented in the contract documents. The Town would like to begin construction of the project in 2025 with completion of the work in its entirety by October 18, 2025. The Contract Documents may be examined at the following locations: 1. Sebago Technics, Inc., 75 John Roberts Road, Suite 4A, South Portland, ME 04106 2. The Contract Documents are available for viewing at Construction Summary of Maine website. Plans and specifications will be available on February 26, 2025 after 4:00 PM. Partial sets will not be distributed. All requests for mailed documents must be accompanied by an additional non-refundable fee of $25.00 to cover postage and handling. Checks should be made payable to SEBAGO TECHNICS. Credit cards will not be accepted. To be considered a responsive Bidder, the Contractor shall have obtained plans and specifications either electronically (PDF format) or hard copy from the Engineer (Sebago Technics). A link to download the plans may be obtained by contacting Kathryn Konopko at kkonopko@sebagotechnics.com or 207-200-2122. The Bid will not be awarded to a Bidder unless a record for obtaining documents from the Engineer exists in the office of the Engineer. All questions are to be submitted to Engineer in writing. Questions may be transmitted by e-mail to kkonopko@sebagotechnics.com. Questionsreceived lessthan 5 working days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. A completed Bid Form, Bid Security, Experience and Qualifications Statement with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid. The Town reserves the right to waive any formalities, to reject any or all bids, to accept a bid or section(s) of a bid and to negotiate a revised scope of services and/or fees should it be deemed in the best interest of the Town to do so. The Town reserves the right to reject any or all bids, to evaluate bids, to waive any formality or technicality in the submissions, to negotiate with any bidder, and to accept any bid or section(s) of a bid deemed to be in the best interests of the Town. A bid must be accompanied by the Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable. Questions deadline: 03/13/2025

Post-Bid

Bridges / Tunnels

$750,000.00

Public - City

Site Work

11

15

3

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
62
Bidding Soon
1,157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.