BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Litchfield, Maine. Completed plans call for site work for a water / sewer project.

Notice ContentThe Town of Litchfield will accept bids to replace the existing underground fuel storage tank at the Litchfield Public WorksDepartment. Bid specifications are online at LitchfieldMaine.org, or at Town of Litchfield, 2400 Hallowell Rd, Litchfield, ME04350 Ph 268-4721/Fax 707-8485. Sealed bids are due by 12 Noon, April 28, 2025 to be opened at 7 pm. (a) Pre-mark area for Dig Safe, including areas where it is okay to dig. (b) Collaborate directly with the Town to prepare, submit, and have accepted a Notice of Intent for Tank Removal and a New Tank Registration, or their acceptable equivalents, to the Maine Department of Environmental Protection. (c) Prepare and provide to the Town, or other permitting agencies as necessary, an environmental site assessment report for the currently existing underground storage tank system. (d) Remove, clean, and dispose of the following existing site components: (i) One (1) 6,000 gallon underground storage tank; (ii) Product piping; (iii) Vent piping; and (iv) One (1) dispenser. Note: the Town is not requesting the Contractor to dispose of any liquid products. (e) Supply and install one (1) eight-foot (8') diameter 12,000 gallon split compartment (8,000 gallon/4,000 gallon) double walled fiberglass underground storage tank with brine interstice. The UST must include fiberglass tank risers. The UST compartments will be siphoned to provide 12,000 gallons of diesel storage. However, the split compartment must be designed to allow for the future conversion of one compartment to gasoline storage if needed. (f) Supply and install UST anchors and concrete deadmen. (g) Supply and install one (1) Wayne Reliance single product hose dispenser (pressure system) with the following design specifications: (i) 10:1 pulser; (ii) Light (iii) Stainless steel cabinet; and (iv) Hanging hardware (hoses, nozzles, swivels, breakaways, etc.) (h) Supply and install two (2) one and one-half inch (1.5") double poppet shear valves (future shear valve to be included). (i) Provide and install the following tank top accessories: (i) Two (2) 15-gallon double-walled overfill manholes; (ii) Two (2) EMCO Wheaton overfill drop tubes; (iii) Two (2) OPW fill adapters and caps; (iv) Two (2) probe caps and adapters; (v) One (1) interstitial cap; (vi) Two (2) twelve-inch (12") rounds (vents); (vii) Two (2) eighteen-inch (18") rounds (ATG & interstitial); and (viii) Two (2) forty-two-inch (42") rounds (STPs). (j) Provide and install 4,000 pound per square inch (PSI) concrete for the following: (i) One (1) 10-ft x 3-ft x 12" island (dispenser and fuel management console); (ii) One (1) 39-ft x 10-ft x 8" tank pad; (iii) One (1) 24-ft x 18-ft x 6" traffic pad; (iv) Two (2) 36-ft v 12" x 12" deadmen. Note: All surface concrete to be 4,000 pound mix with #4 rebar, 12" on center each way, light broom finish and tooled edges. k) Install new electrical conduits and pull new wires for the following petroleum components: (i) One (1) 100-amp sub panel; (ii) One (1) submersible; (iii) One (1) Veeder-Root TLS-4 Monitoring console; (iv) Two (2) ATGs; (v) One (1) interstitial sensor; (vi) Three (3) sump sensors; (vii) One (1) dispenser; (viii) One (1) fuel management console; (ix) One (1) LED light; and (x) Future conduit for future submersible. (l) Provide excavation, backfill, and compactio0n for new tank installation, petroleum conduits, and new piping/sumps (see exclusions contained herein). The bid price should assume that all excavated materials (soil and concrete) will be disposed of on site. (m) Provide a suitable crane to offload and set in the new UST. (n) Provide deliverables of all complete MDEP permits, warranty paperwork for the installed components, site photos, an as-built drawing for the constructed petroleum system, and installation checklists.

Award

Water / Sewer

$256,339.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
27
Bidding Soon
539
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

May 28, 2025

Project location map

To Be Determined, Litchfield, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.