Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 1, 2023 at 7:00 PM

Updated May 15, 2026

Site work for a bridge / tunnel in N Sullivan, Maine. Completed plans call for site work for a bridge / tunnel.

Scope Of Work: Shoulder/ Ditching Specifications: Shoulder width will be maintained and repair any damage from water erosion. Shoulders will be lower and graded at a slightly steeper cross slope to provide positive drainage to the ditch. When needed, RIP RAP should be put in to prevent future washouts. The depth of the ditch should be a minimum of 12" to 18" below the gravel base or follow the original ditch depth when constructed to maintain water flow to existing cross culverts and for water cutouts. No gravel of sod berm or windrow will be left in between the road and the ditch slope. The contractor will call Dig Safe before any work begins and provide the Town of Sullivan with the dig safe permit number. A machine must have a hydraulic ditching bucket and not be any larger than a 23- ton excavator and no smaller than an 18-ton Excavator. The contractor shall avoid sharp turns on the hot top and avoid damage to the surface. Tunk Lake Road specifications: Starting at point from Ronnie Stanley's going uphill ditching, rough rift raff and culvert replacements. Higgs Road specifications: Repair of sink hole in tar by granite culvert with tar patch Edges of road should be made so road edge does not wash out.

Post-Bid

Bridges / Tunnels

$900,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
23
Bidding Soon
210
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2023

December 7, 2023

Project location map

Multiple Locations, N Sullivan, ME

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed