Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Portland, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

All questions shall be directed in writing ONLY to the Purchasing Office at the above address and be received 12:00 noon on February 13th, 2025 (FAX 207-874-8652), or email pfitzgerald@portlandmaine.gov The work includes the installation of approximately 1,100 linear feet of new 12-42 inch storm drain pipe, precast catch basin, manhole, and vault structures, two (2) check valves at the Portland Fish Pier outfall and Maples Street CSO outfall, reconstruction of four (4) ADA ramp, associated construction for roadway trench repair, traffic control and other incidental work including support of existing underground utilities including water, natural gas, electrical, and telecommunications utilities during excavations. Utility protection plans stamped by a professional engineer are required where the proposed storm drain on Commercial Street crosses the existing water main in two (2) locations and stamped utility protection plans where the proposed storm drain crosses the existing 48" and 3'x4.5' sewer mains on Commercial Street. The pavement restoration plan includes trench paving the storm drain trench on Commercial Street and striping and repaving a portion of the Portland Fish Pier parking lot and access drive. The pavement restoration plan is included on sheet 13 of the plan set which depicts the following pavement restoration sequencing and completion dates: Portland Fish Pier Lower Parking Lot (refer to sheet 13 for restoration area limits) 1. Base pave lower parking lot area after trench work is complete by November 15, 2025. 2. Mill butt joints and surface pave parking lot by May 31, 2026. 3. Reopen closed portion of the lower Fish Pier parking Lot by November 15, 2025 Commercial Street Storm Drain Trench and Fish Pier Access Drive (refer to sheet 13 for restoration limits) 1. Base pave fish pier driveway and reopen to traffic by May 31, 2026. 2. Base pave trenches in Commercial Street by May 31, 2026. 3. Mill butt joints and surface pave trenches in Commercial Street and the Fish Pier driveway by May 31, 2027. Project work may not commence until August 1, 2025. Storm Drain work in Commercial Street may not commence until October 13, 2025. All project work must be substantially completed by May 31, 2026 with the entire project ready for final owner acceptance by May 31, 2027. The contractor is expected to complete work on this project during winter months as necessary to meet the project schedule. The successful bidder must submit Performance and Payment Bonds to the City prior to contract award. Detail information can be found in the General Conditions. Dewatering and trench shoring means and methods shall be the contractors responsibility and are incidental to the project. Dewatering, shoring, and erosion control plans shall be submitted to the City for review and approval. Note dewatering and erosion control measures around the outfall must adhere to the US Army Corps of Engineers Pre-Construction Notification Permit attached (Attachment D). The work will generally be located along Commercial Street and the Portland Fish Pier. The Project has an expected duration of 8 Months. The City reserves the right to reject any and all bids should it be deemed for the best interest of the City to do so. The City reserves the right to substantiate any bidder's qualifications, capability to perform, availability, past performance record and to verify that bidders are current in their obligations to the City. Project work may not commence until August 1, 2025. Storm Drain work in Commercial Street may not commence until October 13, 2025. All project work must be substantially completed by May 31, 2026 with the entire project ready for final owner acceptance by May 31, 2027. QA date - 9-3-2025 All questions shall be directed in writing ONLY to the Purchasing Office at the above address and be received 12:00 noon on September 3rd, 2025 (FAX 207-874-8652), or email pfitzgerald@portlandmaine.gov

Award

Water / Sewer

$6,269,000.00

Public - City

Paving, Site Work

19

9

7

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
73
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 20, 2025

Project location map

Commercial St, Portland, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.