BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 31, 2023 at 8:00 PM

Updated July 3, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Rumford Ctr, Maine. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description: Maine Federal Aid Project No. 2189401 WIN 021700.01 Location: In Oxford County, Red bridge is located on U.S. Route It Lincoln Avenue/ Main Street over the Swift River on the Rumford - Mexico town line. Scope of Work: Red Bridge Replacement plus other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Mike Wight at (207) 624-3431, use electronic RFI form or email questions to RFtContract3.MDOTi.fl.maine.gov. project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The Denartmeni will accept a facsimile of the bid bond: however. the original bld bond must then be received at the MDOT Contract Section within 72 hours of the bid opening The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Red Bridge Replacement - Rumford & Mexico - Region 3

Award

Bridges / Tunnels

$8,463,349.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

50

17

14

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
40
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 25, 2023

Project location map

US-2, Rumford Ctr, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.