Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated July 3, 2025
Demolition and site work for a residential development in Sanford, Maine. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Contractor agrees and undertakes to demolish and remove the structures and debris at 8 York Street in its entirety, including complete removal and breaking up the foundation, slab, and any under structure found and removing as needed; and additionally, as part of the project as summarized: o Applying clean soil to match the natural grade of the surroundings in the base bid; o Applying 4" inches of gravel to cover the impacted area of the property provided by the Contractor and included in the base bid. No bid will be considered unless it is accompanied by a Certified Check or Bid Bond in the amount of ten (10%) percent of the bid price, made out in favor of the City of Sanford. Such security shall be governed by the terms of the Bid Form. The successful bidder will not be required to present a 100% Performance and Payment Bond as surety for the performance of the contract. The City of Sanford reserves the right to accept or reject any and all bids. The Contractor shall prosecute the work continuously until completion. Deadline for complete demolition and removal is 30 working days from Notice to Proceed. Notice to Proceed on or before Monday, May 26th Completion date on or before Monday, June 30th A. Demolition of the aforesaid structures located upon land in the City of Sanford; B. Securing all demolition permits from the State of Maine and the City of Sanford and paying for any fees required with respect to such permit; C. Removal of ALL debris from the site; D. Disposition of any and all of the demolition debris other than that sold by Contractor, or otherwise recovered by Contractor as salvage, in accordance with the laws of the United States and the State of Maine and ordinances of the City of Sanford; provided, nevertheless, that Contractor is authorized to sell any salvageable components of the structures for its own account, as set forth below. Within thirty (30) days after completion of Contractor'sservices,Contractorwill providetheCity with copiesofany documents evidencing the ultimate disposition of all demolition debris, except for such as has been sold forsalvage; E. The Contractor will not be responsible for tipping fees; however, all demolition materials not salvaged must be weighed by product category at an authorized disposal site and transportation manifest and bills of lading from the disposal site provided to the City for reimbursement or billed directly to the City by a pre-approved disposal site; F. The City and Contractor identify the disposal site(s) as follows: o JA Simpson Inc. G. Disconnection and capping of any water or sewer service(s) at approximately 6 feet from the foundation edge, currently connected within the project to the satisfaction of the Sewer and Water Districts; H. Foundation walls, slab, underpinnings, and concretefloor shall be removed or concretecrushedtonomore than8-inchdiameter sizedpiecesas part of the base bid; I. Any cellar holes shall be filled with clean soil as part of the base bid. The Director of Code Enforcement must be shown the empty cellar hole, devoid of the foundation, before filling; J. Compliance at all times and at Contractor's sole cost, during the period of demolition, with the requirements of the laws of the United States and the State of Maine, and the City of Sanford Code, including, without limitations, conformity with all reasonable demands of the Fire Department. K. Securing the demolition area during the period of demolition at all times by reasonable means acceptable to the Code Enforcement Officer. In the event it shall be or become necessary to temporarily close any streets, Contractor shall, prior to commencement of the work, apply for and obtain from the Public Works Department a permit for the temporary closing of such streets.
Bid Results
Residential Subdivision
$11,700.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
May 26, 2025
8 York St, Sanford, ME
Related To This Project
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
--
Sanford, ME
Bid Date: Nov 20 2025
Sanford, ME
Bid Date: Nov 18 2025
Sanford, ME
Bid Date: Apr 16 2025
Sanford, ME
--
Sanford, ME
Bid Date: Feb 12 2025
Sanford, ME
Bid Date: Feb 12 2025
Sanford, ME
Bid Date: Jan 22 2025
Sanford, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
