Published March 30, 2022 at 8:00 PM

Updated July 3, 2025

Demolition, site work and new construction of a water / sewer project in South Paris, Maine. Completed plans call for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.

A tank replacement including demolition of the existing storage facility, site work, and construction of a new 500,000-gallon prestressed wire wound concrete water storage tank adjacent to the existing tank. The project also includes an active tank mixer, new instrumentation and radio equipment, an extension of single-phase electrical service eliminating the existing solar powered radio system, and upgrades to the existing access road including a new gravel base and cross culvert. Engineer's Estimate: $1,400,000 The Owner reserves the right to reject any or all bids,including without limitation, nonconforming,nonresponsive, unbalanced, or conditional Bids.Owner also reserves the right to waive all minor Bid informalities not involving price,time,or changes in the work. 1. Construction of: a. New 500,000-gallon wire-wound precast concrete storage tank; b. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings; c. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing 500,000-gallon Hooper Ledge buried cast-in-place concrete tank. b. Other existing structures shown on the plan c. Piping and conduit, as indicated on the Drawings; 3. Remove and/or relocate equipment as indicated on the Drawings and as described below but not limited to: a. Existing RTU Control Panel b. Existing wood utility pole to be relocated with radio antenna 4. The Owner will furnish the SCADA programming scope for the existing tank site RTU and Master RTU at the District's office. The Work will be substantially complete on or before November 30, 2022, General Conditions on or before December 31, 2022

Award

Water / Sewer

$1,248,000.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
36
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2022

May 3, 2022

Project location map

Hooper Ledge Rd, South Paris, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.