Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 24, 2022 at 8:00 PM
Updated July 3, 2025
Site work and new construction of a military facility in Woodville, Maine. Completed plans call for the construction of a military facility; and for site work for a military facility.
The Department of Defense, Veterans and Emergency Management (DVEM) is conducting a competitive bid process for the Fire Truck Building Project at The Woodville Training Site (WTS) in T2 R9 TWP, Maine. Project consists of two significant construction activities. The first is the construction of an 1,800-sf new construction concrete masonry unit (CMU) building with light gauge metal pre-engineered roof trusses to provide storage for two US Army Type 6 Wildland Firefighting vehicles and associated wildland firefighting equipment. The new building will be constructed on an existing gravel area on a frost wall with slab. Utility work will include domestic water, power, site lighting, propane tanks, communications, and stormwater. The second significant construction activity is the construction of new overhead single phase electrical utility line from the nearest last utility owned pole to the new facility. The length of this new power line is approximately 10,000 linear feet. The detailed Notice to Contractors is on the Bureau of General Services website. Project consists of two significant construction activities. The first is the construction of an 1,800-sf new construction concrete masonry unit (CMU) building with light gauge metal pre-engineered roof trusses to provide storage for two US Army Type 6 Wildland Firefighting vehicles and associated wildland firefighting equipment. The new building will be constructed on an existing gravel area on a frost wall with slab. Utility work will include domestic water, power, site lighting, propane tanks, communications, and stormwater. The second significant construction activity is the construction of new overhead single phase electrical utility line from the nearest last utility owned pole to the new facility. The length of this new power line is approximately 10,000 linear feet.
Bid Results
Military
$1,450,900.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2022
October 4, 2022
To Be Determined, Woodville, ME
Related To This Project
Eliot, ME
--
Bangor, ME
Bid Date: Aug 23 2022
South Portland, ME
--
Eagle Lake, ME
Bid Date: Aug 12 2022
Eagle Lake, ME
Bid Date: Aug 12 2022
Lewiston, ME
Bid Date: Aug 16 2022
Augusta, ME
Bid Date: Sep 16 2022
Augusta, ME
Bid Date: Jun 01 2022
Brewer, ME
Bid Date: Jun 30 2022
Cumberland Center, ME
Bid Date: Aug 24 2022
Fairfield, ME
--
Brunswick, ME
--
Saco, ME
--
Cushing, ME
Bid Date: Aug 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
