EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 29, 2025 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a detention facility in Burns, Oregon. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

The Harney County Court, acting through Harney County, hereinafter referred to as Harney County is requesting Statements of Qualifications from interested and qualified Design-Builders (Respondents) to provide design, preconstruction, and design-build construction services for the project referenced above (Project). The delivery method for this Project is a modified form of Harney County's Design-Build process, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services to define the Project, hereinafter referred to as Phase 1, and Phase 2-Design-Build Construction Services to complete the design and construct the Project, hereinafter referred to as Phase 2. There will be separate agreements for each phase. This modified process selects the Design-Builder on qualifications and proposed fees (a design competition is not utilized). During Phase 1 Harney County will issue a design and preconstruction services agreement, under which the Design-Builder will: complete the programming; develop the schematic design; site determination; commit to a guaranteed maximum price (GMP) and schedule; start Design Development; confirm other criteria are appropriate; and obtain Harney County's approval. Upon receipt of the approval of the schematic design and Harney County's authorization to proceed, Design-Builder shall: continue with the design development; publish a set of the Design-Build Construction Documents; and establish and submit a GMP to Harney County. During Phase 2 Harney County will issue a GMP collaborative design-build agreement incorporating: the Design-Build Contract Documents; updated criteria; direct construction cost budget; GMP; contingency; remaining design fees; site management fees; payment and performance bond premiums; overhead and profit; and schedule as agreed upon in Phase 1. Harney County will not be obligated to proceed with Phase 2 with the selected Design-Builder. The Design-Builder is not obligated to proceed with Phase 2 if it so determines that the budget is not adequate, or for other business reasons. Phase 1 work products and electronic files of the Design-Builder are the property of Harney County. In the event Harney County and Design-Builder do not continue into Phase 2, these documents will be used by Harney County in any manner, including use as bridging documents for subsequent contracts. The Direct Construction Cost Budget is approximately $ 8,000,000.00 in hand, while pursuing additional funding. The Design-Builder is required to be prequalified by Harney County's Prequalification Program Administrator; refer to Request for Qualifications Section 4. The Architect is required to be licensed and bonded in the state of Oregon. All Respondents must be prequalified with Harney County one day prior to the Statement of Qualifications due date, or their Statement of Qualification submission will not be considered. The last day to submit an application for prequalification online to Harney County is indicated on the enclosed schedule. Each Respondent's prequalification rating must be greater than the budgeted Phase 2, Design-Build Construction Services agreement amount for this Project. Direct any prequalification questions to Harney County's Prequalification Administrator at dan.jenkins@harneycountyor.gov. 5 - TENTATIVE SELECTION PROCESS SCHEDULE Schedule Activities Schedule Last day to submit RFQ questions January 31, 2025, by 5:00 p.m. Proposer Shortlist published by e-mail March 1, 2025 RFP distributed to shortlist March 3, 2025 Last day to submit RFP questions March 10, 2025 Proposals due date and time March 17, 2025, by 12:00 p.m. Proposing firms interviewed (Week of) March 24, 2025 Successful Proposer announced April 3, 2025 Phase 1 (design and preconstruction services) agreement executed April 24, 2025 Schematic design submittal due May 30, 2025 Phase 2 (design build) agreement executed June 16, 2025 Phase 2 start date (NTP) June 26, 2025 Notice of Completion TBD Design-Build contract duration TBD Respondents shall direct all communications concerning the selection process to the Managing Office for the Selection Process. In e-mail communications, place the name of the Project in the subject line. The County contact for the Managing Office for the Design-Build Selection Process is: County Contact Name Dan Jenkins, Sheriff County, Dept. Harney County, Harney County Sheriff's Office Address (mailing): 485 N. Court Ave., Burns, OR. 97720 Telephone: 541-573-6156 Fax: 541-573-1226 E-Mail: Dan.jenkins@harneycountyor.gov Respondents must submit all questions regarding this Request for Qualification in writing by e-mail or mail to the Managing Office for the Selection Process and received no later than the due date indicated in the Selection Process Schedule. Harney County will not consider questions received after the due date. Written responses to submitted questions will be sent by Harney County to all registered Respondents. Respondents may request clarifications verbally; however, Harney County will not consider verbal responses binding.

GC Bidding

Jails / Prisons

$8,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
5
All Active Projects
3
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

June 26, 2025

img_map_placeholder

485 N Court Ave, Burns, OR

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ D/B - Harney County Jail Facility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.