BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a transportation facility in Georgetown, South Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Georgetown County is seeking competitive sealed bids to include removal of the existing Runway 11-29 and replacement with a reconstructed Runway 11-29. Please see bid document and drawings for additional information and bid requirements. Question Deadline 03/19/2025 at 3:00 PM ET Scope of Work: The Runway 11-29 Reconstruction project at the Georgetown County Airport includes removal of the existing Runway 11-29 and replacement with a reconstructed Runway 11-29. Work elements include erosion control installation, bituminous pavement removal, grading, storm drainage installation, aggregate base course placement, bituminous paving (SCDOT Bituminous Surface Course – Type ‘B’ and SCDOT Bituminous Base Course -Type ‘A’), marking, lighting and signage installation, sodding, seeding, and mulching. The project will be awarded to one Contractor in the best interests of Georgetown County, dependent on availability of local, state, and federal funding

Award

Transportation Terminals

$5,696,360.00

Public - County

Paving, Site Work

49

12

15

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
1
Bidding Soon
373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 25, 2025

Project location map

129 Airport Rd, Georgetown, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.