Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2025 at 7:00 PM
Updated February 13, 2025
Renovation of an educational facility in Northridge, California. Conceptual plans call for the renovation of a 100,000-square-foot educational facility.
This project will renovate Sierra Hall (#6) (100,000 ASF/165,000 GSF), built in 1963, after the relocation of all classrooms to the Sierra Annex (#137) which is currently under construction. Sierra Hall Renovation project will bring the 58-year-old building up to current life/fire safety, seismic, energy, and ADA codes, as well as to address deferred maintenance and key critical building infrastructure issues in seismic, mechanical/electrical systems, telecommunication infrastructure, fire sprinklers, hazardous materials abatement, and energy efficiency. The building has a 10-year recurring and non-recurring renewal need in excess of $37 million. At the completion of the project, the building will be improved to a Seismic IV rating. Spaces vacated as a result of the Sierra Annex project will be used to support student success and advising, consolidate the College of Social and Behavioral Sciences departmental and faculty offices, house programs within the College of Humanities, and support strategic University priorities to promote equity and inclusion. A portion of the vacated space will remain as tenant improvement shell space which will be funded and renovated at a later date by the University. This project is currently in the California State University's FY 2024-2025 CIP. Per the owner, as of February 12, 2025, this project is not funded and not expected to be funded until 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$138,439,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2028
18111 Nordhoff St, Northridge, CA
Related To This Project
Northridge, CA
--
Northridge, CA
Bid Date: Jun 01 2020
Millbrae, CA
Bid Date: Jul 12 2022
Point Mugu NAWC, CA
Bid Date: Jun 24 2022
Salinas, CA
Bid Date: Jul 22 2022
Santa Barbara, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
