Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a mixed-use development in North York, Ontario. Completed plans call for site work for a transportation facility; for the construction of a 104,000-square-foot, two-story above grade transportation facility; and for the renovation of a bridge / tunnel.
Construction of approximately 11.2 km light rail transit (LRT) that will run in a semi-exclusive lane along Finch Ave West between Keele St. and Hwy. 27, with an underground interchange at the Finch West station (connecting to the TTC Line 1 Yonge-University subway) and a below-grade stop at Humber College The project consists of a below-grade terminal stop next to Humber College, 18 public transit stations, an underground interchange at Keele Street that connect with the new Finch West Subway Station on the Toronto-York Spadina Subway Extension, and renewal of aging infrastructure such as the Hwy. 400 overpass at Finch Avenue West. This will be a "Rapid Bridge Replacement" with the majority of the new bridge construction to take place beside the Hwy. and not in the road. TIMELINE: A joint venture of ACS Infrastructure and AECON that has a DBFM (design, build, finance, maintain) contract. Site plan approvals for the Maintenance and Storage Facility and the Finch West Station have been submitted to Toronto City Council. Track installation started in 2020 and will continue at the Maintenance and Storage Facility (MSF), and start up along the Finch West guideway. Installation of the overhead catenary system (OCS) poles, that will one day power the LRT line, will also continue through 2021, project completion anticipated fall 2023. The proposed LRT line is to be operational in the second half of 2023. *The value listed represents the project contract value. NOTE: Mosaic Transit Group is the consortia awarded for design, build, finance and maintain of this LRT project. Prime Team Members of Mosaic Transit Group include: Applicant Lead: ACS Infrastructure Canada Inc., Aecon Concessions, CRH Canada Group Inc.; Construction: Aecon Infrastructure and Management Inc., Dragados Canada Inc., Dufferin Construction Company a division of CRH Canada Group Inc.; Design: Arup Canada Inc., Dillon Consulting Limited, DPM Energy Inc., DTAH, Perkins + Will Canada Inc., Sener SES Canada Inc.; Maintenance: ACS Infrastructure Canada Inc, Aecon O&M - a division of Aecon Construction Group Inc.; and Financial Advisor: RBC Dominion Securities Inc. During construction, Mosaic Transit Group will work with subcontractors, trade unions, and workforce development agencies to identify and select suitable professional, administrative, technical and trades people to work on the project. Their goal is to hire local residents, including women, members of historically disadvantaged and equity-seeking groups, veterans, new immigrants, First Nations people and youth.
Under Construction
Transportation Terminals
$249,500,000.00
Public - State/Provincial
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2020
Multiple Locations, North York, ON
Related To This Project
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
--
North York, ON
Bid Date: Jan 11 2021
North York, ON
--
North York, ON
--
North York, ON
Bid Date: Oct 23 2020
North York, ON
--
North York, ON
--
North York, ON
Bid Date: Aug 11 2020
North York, ON
Bid Date: Mar 15 2019
North York, ON
--
North York, ON
--
North York, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.