BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a clubhouse / community center in Wilbraham, Massachusetts. Completed plans call for the construction of a 15,890-square-foot, three-story above grade clubhouse / community center; for site work for a clubhouse / community center; and for paving for a clubhouse / community center.

The scope of work includes the Construction of a three story, 15,890 square foot Senior Center building, including associated site clearing, site preparation and development. The General Contractor shall be DCAMM certified. Scope includes but is not limited to: site improvements, foundations, slabs-on-grade, steel framing, metal deck with concrete, exterior and interior finishes, kitchen equipment, fire protection, plumbing, HVAC and electrical. Scope of work includes, but is not limited to: Cast-In-Place Concrete; Adhered Stone Masonry Veneer; Miscellaneous and Ornamental Iron; Structural Steel Framing; Shear Connectors; Steel Decking; Cold-Formed Metal Framing; Cold-Formed Metal Trusses; Metal Pan Stairs; Rough Carpentry; Exterior Finish Carpentry; Architectural Woodwork; Plastic Paneling; Glass-Fiber-Reinforced Plastic Fabrications; Waterproofing, Dampproofing and Caulking; Foamed-In-Place Insulation; Asphalt Shingles; Fiber Cement Siding; PVC Roofing; Hollow Metal Doors & Frames; Aluminum Frames; Flush Wood Doors; Coiling Counter Doors; Aluminum-Clad Wood-Framed Panel-Folding Glass Doors; Aluminum-Framed Entrances & Storefronts; Wood Windows; Tubular Day-Lighting Devices; Door Hardware; Fixed Louvers; Gypsum Board Assemblies; Wood Flooring; Resilient Flooring; Tile Carpeting; Sound-Absorbing Wall Units; Signage; Plastic Toilet Compartments; Folding Panel Partitions; Toilet Accessories; Gas Fireplaces; Fire Protection Specialties; Flagpoles; Food service Equipment; Projection Screens; Roller window Shades; Entrance Floor Mats and Floor Grilles; Elevators; Wheelchair Lifts; Fire Protection; Plumbing; HVAC; Electrical; Site Work; and Planting. b. Revised bid dates: File Sub Bids due: 3 October 2022 General Contractor’s Bids due: 13 October 2022 c. All file sub-c PLEASE NOTE: Per Addendum 5: Any questions sent from Friday 30 September to present should be resent to the following addresses: jcatlin@c-parchitects.com and dartz@c-parchitects.com.

Award

Clubhouse / Community Centers

$9,130,000.00

Public - City

New Construction, Paving, Site Work

131

55

40

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
175
Bidding Soon
3,656
All Active Projects
1,523
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

November 7, 2022

img_map_placeholder

Springfield St, Wilbraham, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.