BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Lawtey, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As per the Owner the project has no bids received, so postponed until further notice. Editorial Content Team is actively seeking updated information Counties: Clay Road Name: SR 200(US 301) From: Bradford C/L to: North of CR 218 Limits: 71030000 Project(s): 43035245201(*) Federal Aid No: D217069B Total Roadway Length: 3.394 Miles Contract Days: 830 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.394 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days (Acq. time) The Florida Department of Transportation will be constructing a concrete test road. The test road will investigate the latest innovations in concrete pavement design, construction, materials and instrumentation. It is critical that the contractor selected for the construction of the experimental pavement sections be very experienced in constructing concrete pavements and understand the complexity of building an experimental test facility. Data from this project will guide the Department when developing future design, construction and material specifications and policies related to concrete pavements. The project will be built parallel to US 301, east of the existing northbound lanes. It will consist of 2 additional northbound lanes. The project limits will be from MP 0.116 to MP 3.510. There will be 52 test sections within these limits. This contract is being procured under Florida Statute 337.025, Innovative highway projects. The process for selecting a construction contractor for this construction contract is a two-part process. Part One includes evaluation of letters of qualification provided by Bidders in response to the advertisement. Each Bidder will be evaluated against the Minimum Qualification Criteria established for this project. Each Bidder will be determined to be Responsive or Nonresponsive to those Minimum Qualification Criteria. The procedures of Part One are governed by Section Two of the Special Requirements. The actual award of the contract for this project will be made to the Responsive Bidder submitting the lowest cost qualifying bid. See the Special Requirements document for details. Prequalification Required. Railroad Insurance Will Be Required. Below is the current schedule of the events that will take place in the procurement process. The Department reserves the right to make changes or alterations to the schedule as the Department determines is in the best interests of the public. Proposers will be notified sufficiently in advance of any changes or alterations in the schedule. Unless otherwise notified in writing by the Department, the dates indicated below for submission of items or for other actions on the part of a Proposer shall constitute absolute deadlines for those activities and failure to fully comply by the time stated shall cause a Proposer to be disqualified. Technical Review Committee (TRC) Meetings: TRC Mtg. No. 1: March 13, 2020 at 10:00 A.M. TRC Mtg. No. 2: March 16, 2020 at 1:30 P.M. TRC Mtg. No. 3: March 17, 2020 at 10:00 A.M. TRC Mtg. No. 4: March 18, 2020 at 1:30 P.M. TRC Mtg. No. 5: March 19, 2020 at 10:00 A.M. The Technical Review Committee meetings will be held at the Florida Department of Transportation, State Materials Office, 5007 N.E. 39th Avenue, Gainesville, Florida 32609. District Selection Committee Meeting: March 30, 2020 at 10:00 A.M. The District Selection Committee meeting will be held at the Florida Department of Transportation, District Two District Office, 1109 S. Marion Avenue, Lake City, Florida 32025-5874. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Portland Cement and General Contractor

Award

Roads / Highways

$17,677,113.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
89
Bidding Soon
1,398
All Active Projects
554
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 20, 2020

March 2, 2020

June 10, 2022

img_map_placeholder

FL-200, Lawtey, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.