BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Demolition, site work and paving for a playground / park / athletic field in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; for the demolition of a playground / park / athletic field; and for paving for a playground / park / athletic field.

125724, 2015213.03 A/E ESTIMATE: $4,572,000.00 For purposes of the Inclusion Plan, this is considered a Parks type of project with a Past Performance of 25% WMBE utilization rates based on completed projects Fencing, temporary tree, vegetation soil protection, sedimentation, and erosion control. Clearing and grubbing of vegetation, tree removal. Identification, location and protection of art, park elements, adjacent properties, utilities, piping, electrical, expansion joints and other elements to remain. Selective demolition of concrete paving, cementitious overlay, and waterproofing material over existing parking structure. Selective demolition and saw cutting of concrete curb, concrete slab concrete park elements, wood, and metal elements on grade and below grade. Selective demolition of water, sewer, electrical and drainage. Selective demolition of metal railing, metal gutter, metal pergola. Expansion joint work on both new and existing assemblies. Coordination and sequencing of utility work, concrete work, drain work, and cementitious overlay work with waterproofing. Cementitious overlay work on parking structure. Concrete walls, concrete curbs, concrete stairs, concrete paving, concrete infill, concrete bases both on structure and on grade. Surface preparation for and installation of specialty waterproofing over the existing parking structure. Surface preparation for and installation of specialty waterproofing at new and existing concrete per plans, details, and specifications. Irrigation, water and drain piping on/within structure and below grade. Trench drains within concrete structure and on grade. Electrical work to include conduit, boxes, fixtures lighting and connections. Concrete, steel and wood components for rails and furnishings. Steel handrail, guardrail, supports and fabrications. Grading, soil prep, irrigation, plantings, grass and plant establishment. New drinking fountain waste receptacles and park fixtures. Additive #1: Replacement of pergola Additive #2: Furnishings and interpretive elements Additive #3: Storage Closet Deadline for Contractor questions regarding this Department of Parks and Recreation project shall be submitted by close of business on Monday, May 18th, 2022, to the Department of Parks and Recreation project manager via shannon.glass@seattle.gov

Occupancy

Playgrounds / Parks / Athletic Fields

$7,357,000.00

Public - City

Demolition, Paving, Site Work

109

30

133

8

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
97
Bidding Soon
1,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

July 25, 2022

Project location map

1900 Western Ave, Seattle, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.