BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2021 at 8:00 PM

Updated August 14, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Jacksonville, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Duval Road Name: SR 117 (Norwood Ave) Limits: Over Moncrief Creek Br Project(s): 43743815201(*) Federal Aid No: D220080B Total Roadway Length: 0.094 Miles Contract Days: 350 Total Bridge Length: 0.023 Miles Total Proposal Length: 0.117 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Days (Acq. time) The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutter, lighting, guardrail, bridge replacement, sidewalk and other incidental construction on SR 117 over Moncrief Creek in Duval County. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 007 Bridge Replacement - SR 117

Award

Bridges / Tunnels

$5,681,190.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

15

5

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
25
Bidding Soon
1,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2021

November 15, 2021

Project location map

FL-117, Jacksonville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.