Site work and new construction of a mixed-use development in Delta, British Columbia. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.

The Terminal Two Project is the construction of a new three-berth marine container terminal adjacent to the existing Deltaport & Westhore Terminals; to include eight-ten new gantry cranes; on-site container storage & intermodal facilities; to provide additional 2.4 million units of container capacity per year; ancillary systems & support facilities; tug basin expansion; rail improvements; road work; construction of a 1.5 Km long artificial island to handle ships up to 400 m long. TIMELINE: A preferred proponent has been selected as the result of a progressive design-build procurement for the landmass and wharf component of the project. Design/Build Team: TerraMarine: comprised of FlatironDragados Canada Inc., Van Oord Canada Ltd., Aecon Constructors, a division of Aecon Construction Group Inc. and Carlson Construction Group Inc and supported by design firm Arcadis Professional Services Canada Inc. and sub-consultants Stantec Consulting Ltd., TYPSA Inc., and Tetra Tech Canada Inc. Construction mobilization and early works are expected in 2027, with major land reclamation works anticipated to begin in 2028. TerraMarine will now work with the port authority, First Nations, and regulators to advance construction planning, including logistics, work planning, costs, schedule, early works and sub-contracting opportunities, including for Indigenous-owned businesses. *Once initial work has sufficiently advanced and following financial close, the port authority intends to award a target price design-build agreement to TerraMarine. Financial close, construction mobilization, and early works are set to occur in late 2027, with construction (land reclamation) starting in 2028. Terminal operations are expected to begin in the mid-2030s. Further update in early 2027. *A progressive design-build model is being pursued.

Pre-Construction/Negotiated

Transportation Terminals

$3,500,000,000.00

Public - Federal

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
2
Bidding Soon
2,669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.