Published July 14, 2026 at 8:00 PM
Updated July 19, 2026
Site work and new construction of a mixed-use development in Delta, British Columbia. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.
The Terminal Two Project is the construction of a new three-berth marine container terminal adjacent to the existing Deltaport & Westhore Terminals; to include eight-ten new gantry cranes; on-site container storage & intermodal facilities; to provide additional 2.4 million units of container capacity per year; ancillary systems & support facilities; tug basin expansion; rail improvements; road work; construction of a 1.5 Km long artificial island to handle ships up to 400 m long. TIMELINE: A preferred proponent has been selected as the result of a progressive design-build procurement for the landmass and wharf component of the project. Design/Build Team: TerraMarine: comprised of FlatironDragados Canada Inc., Van Oord Canada Ltd., Aecon Constructors, a division of Aecon Construction Group Inc. and Carlson Construction Group Inc and supported by design firm Arcadis Professional Services Canada Inc. and sub-consultants Stantec Consulting Ltd., TYPSA Inc., and Tetra Tech Canada Inc. Construction mobilization and early works are expected in 2027, with major land reclamation works anticipated to begin in 2028. TerraMarine will now work with the port authority, First Nations, and regulators to advance construction planning, including logistics, work planning, costs, schedule, early works and sub-contracting opportunities, including for Indigenous-owned businesses. *Once initial work has sufficiently advanced and following financial close, the port authority intends to award a target price design-build agreement to TerraMarine. Financial close, construction mobilization, and early works are set to occur in late 2027, with construction (land reclamation) starting in 2028. Terminal operations are expected to begin in the mid-2030s. Further update in early 2027. *A progressive design-build model is being pursued.
Pre-Construction/Negotiated
Transportation Terminals
$3,500,000,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2028
Roberts Bank Way, Delta, BC
Related To This Project
Delta, BC
Bid Date: Jan 27 2023
Delta, BC
Bid Date: Sep 27 2023
Delta, BC
Bid Date: Apr 25 2019
Delta, BC
Bid Date: Dec 16 2022
Delta, BC
Bid Date: Feb 15 2022
Delta, BC
Bid Date: Apr 21 2023
Delta, BC
Bid Date: Jan 25 2022
Delta, BC
Bid Date: Jul 14 2022
Delta, BC
--
Delta, BC
--
Delta, BC
Bid Date: Jan 13 2023
Delta, BC
Bid Date: Sep 26 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.