BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Renovation and addition to an educational facility in Coalhurst, Alberta. Conceptual plans call for the renovation of a educational facility; and for the addition of a educational facility.

Scope of work includes a comprehensive modernization of an existing school facility. Programmatic enhancements include, but are not limited to: Grade configurations 5 to 12, CTS, IOP, fine arts, physical education, learning commons, gathering spaces, breakout spaces, washroom upgrades, architectural finishes and fixtures (ceiling, floors, paint, dividers, revamping the main foyer), upgrades to administrative spaces, revamping exterior entrances. Addition of 2000m2 to the current 3187m2 building. TIMELINE: Request for Proposals for Prime Consultant services is currently underway. Design completion (Tender ready package) is anticipated within eight (8) months from the date the Prime Consultant enters into a contract with Palliser School Division. Construction will be conducted in multiple phases over the course of a minimum of two years. *Budget is $27.9 million.

Conceptual

Educational

$27,900,000.00

Public - State/Provincial

Addition, Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2027

Project location map

415 53 Ave, Coalhurst, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.