BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in St Martin, Manitoba. Contact the soliciting agency for additional information.

Manitoba Transportation and Infrastructure is constructing a permanent flood control management system to better regulate water levels on both Lake Manitoba and Lake St. Martin. The Lake Manitoba and Lake St Martin Outlet Channel Project (Outlet Channels Project) involves the construction of the Lake Manitoba Outlet Channel (LMOC), Lake St. Martin Outlet Channel (LSMOC) and other components such as outside drains, a construction road, bridges, water control structures, a Manitoba Hydro distribution line, PR 239 realignment and municipal roads re-connections. The Outlet Channels Project continues to advance through the final stages of the environmental assessment process. Preliminary design of the Outlet Channels Project is complete and detailed design work is underway. Manitoba continues to plan for construction to begin pending receipt of provincial and federal environmental licences. Construction is anticipated to take three years to complete. Work on the Outlet Channels Project includes: - Approximately 22,000,000 m3 of earth moving - Construction of three bridges - Construction of two water control structures including: approximately 16,000 m3 of concrete, design supply and installation of gates, gate guides and hoist structures, and construction of ancillary buildings - Approximately 35 km of road construction - Supply and placement of riprap (approximately 700,000 t) - Supply and placement of crushed rock (approximately 1,400,000 t) A construction sequencing and contracting strategy has been prepared in which approximately 24 construction contracts are planned to undertake the construction phase. More information about the Outlet Channels Project and construction sequencing and contracting strategy can be found at: - Outlet Channels Project website https://www.gov.mb.ca/mit/wms/lmblsmoutlets/index.html - Construction Sequencing and Contracting Strategy July 2021 Newsletter https://www.gov.mb.ca/mit/wms/lmblsmoutlets/resources/pdf/newsletter/july_2021_newsletter.pdf January 2022 Newsletter https://www.gov.mb.ca/mit/wms/lmblsmoutlets/resources/pdf/newsletter/january_2022_newsletter.pdf Any questions can be sent to: OutletChannels@gov.mb.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Water / Sewer

$540,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
11
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2022

July 19, 2022

Project location map

Multiple Locations, St Martin, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.