Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Springfield, Vermont. Completed plans call for site work for a water / sewer project.
Per the owner, as of October 6, 2023, this project has been completed. Closed solicitation has been included below for reference. ............... Contractors are invited to bid on the River Bank Retaining Wall Replacement Project for the Department of Buildings & General Services located at 100 Mineral Street in Springfield, Vermont. The project consists of, but is not limited to, construction of a new reinforced concrete retaining wall, approximately 150 feet in length, with waterproofing and drainage. A portion of the existing wall will remain in place as a cofferdam during construction and the upper portion of the existing wall will be partially demolished, leaving sufficient structure to enable access to the riverside. Demolished portions of the existing wall to be re-used as fill between the new and existing walls as well as headwall(s) for drainage structures on the site. A portion of one existing sluiceway wall to have its scour remediated. All excavation to follow the Corrective Action plan. Approximately 1800 cubic yards of soil will be excavated: 1,100 cubic yards will be used as re-fill; 700 cubic yards will be disposed of offsite as waste or daily cover. Excavated soil will be stockpiled on polyethylene plastic sheeting. any material transported offsite will be done in accordance with the Soil Management Plan. Excavation to include temporary removal, storage and resetting of drainage structures and piping, and pavement. Demolition and excavation are to occur while minimizing disturbance to an existing concrete pier and dry laid stone wall. Replace bituminous concrete pavement and repaint/ remark striping disturbed by construction. DELIVERY METHODS: a. SECURITY PROCEDURES: Note that security procedures concerning delivery of any mail or parcels to 109 State Street may delay receipt of mail/parcel pieces by one business day. b. U.S. MAIL: Bidders are cautioned that it is their responsibility to originate the mailing of bids in sufficient time to ensure bids are received and time stamped by the Office of Purchasing & Contracting prior to the time of the bid opening. c. EXPRESS DELIVERY: If bids are being sent via an express delivery service, be certain that the RFP designation is clearly shown on the outside of the delivery envelope or box. Express delivery packages will not be considered received by the State until the express delivery package has been received and time stamped by the Office of Purchasing & Contracting. Due to security procedures express deliveries must be received by 10:30 AM in order to be received by the Office of Purchasing & Contracting that same day. d. HAND DELIVERY: Hand carried bids shall be delivered to a representative of the Office of Purchasing & Contracting prior to the bid opening. e. ELECTRONIC: Electronic bids will not be accepted. f. FAX BIDS: Faxed bids will not be accepted. 6. Full Bonding is required for this job. 7. SUBMITTAL EXCHANGE : Contractor shall obtain a license for the State to utilize Submittal Exchange for the purposes of this project. The method of contractor selection has not been determined at this time. Question end date 01/17/2020.
Occupancy
Water / Sewer
$1,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2021
100 Mineral St, Springfield, VT
Related To This Project
Springfield, VT
Bid Date: Jan 12 2024
Springfield, VT
Bid Date: Jan 26 2024
Springfield, VT
Bid Date: Oct 23 2019
Springfield, VT
Bid Date: Feb 20 2024
Springfield, VT
Bid Date: Feb 28 2024
Springfield, VT
Bid Date: Mar 07 2024
Springfield, VT
Bid Date: Mar 25 2024
Springfield, VT
Bid Date: Mar 20 2024
Springfield, VT
--
Springfield, VT
Bid Date: Aug 28 2023
Springfield, VT
Bid Date: Mar 29 2019
Springfield, VT
--
Springfield, VT
Bid Date: Apr 21 2023
Springfield, VT
Bid Date: Apr 19 2023
Springfield, VT
Bid Date: Mar 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.