Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 2, 2024 at 7:00 PM

Updated April 17, 2025

Site work, paving and renovation of a civil project in Sanford, Florida. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project has been completed. Centennial, Colorado-based SEMA Construction Inc. will continue work on the 3.5-mile Section 7A following a year of work by Davie-based Astaldi Construction Corp. that started on April 1, 2018. The work, which stretches from Longwood-Markham Road to Orange Boulevard, is expected to continue on schedule for a 2022 completion. ............ Counties:SEMINOLE Road Name: SR429/46 (Wekiva Pkwy Section 7A) Project(s): 24020025201(*) Federal Aid No: 3141042P Project(s): 24020025602 Federal Aid No: N/A Project(s): 24020025604 Federal Aid No: N/A Total Roadway Length: . Miles Total Bridge Length: 0. Miles Total Proposal Length: . Miles The improvements under this contract consist of the following items of work to construct SR 429/SR 46 (Wekiva Parkway Section 7A). The items of work include new road construction of a four-lane divided limited access toll facility located on an elevated embankment with MSE walls, and two one-lane, one-way non-tolled frontage roads at-grade, parallel to the Parkway. The frontage roads include four roundabouts at-grade, while the Wekiva Parkway bridges over. Toward the end of the project, the two frontage road alignments converge to a six-lane divided roadway, while the Wekiva Parkway alignment curves to the southeast. The major items of work include new road construction with four roundabouts, twelve new bridges, MSE walls, slip ramps, drainage improvements, curb and gutter, sidewalk, guardrail, traffic signals, signing installation (including overhead truss and cantilever truss construction), final surface painted pavement markings, bike lanes, lighting, Intelligent Transportation Systems, miscellaneous structures, retaining walls, two toll sites with gantries and buildings, and two Utility Work by Highway Contractor goes-with projects. FDOT - SR429/46 (Wekiva Pkwy Section 7A)

Occupancy

Bridges / Tunnels

$108,299,973.00

Public - State/Provincial

Paving, Renovation, Site Work

1593

1

6

9

Subscribe For Documents

238 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
149
Bidding Soon
2,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2017

June 4, 2019

Project location map

FL-46, Sanford, FL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed