Site work and new construction of a mixed-use development in Sanford, Florida. Working plans call for the construction of a transportation facility; for site work for a transportation facility; 12,500-square-foot pre-engineered storage facility; and pre-engineered storage facility.

The Sanford Airport Authority (Owner) requires a Design-Build Team (Respondent) to provide design and construction services for a new Maintenance Building on Owner property in Sanford, Florida in accordance with 287.055(9), Florida Statutes. When complete, the new building will be used for the daily operations of the Owner Maintenance Department. The objective of the RFQ is to identify and seek competitive qualifications from Respondents to provide services to design, permit and construct the new building in accordance with the design criteria package. The project can be generally described as: Design and construction of a 12,500 square feet of pre-engineered metal building and associated site improvements on an existing parcel of land at the Orlando Sanford International Airport. Work includes new building for office space, storage, and mechanics bay. Site improvements include parking, drive aisles, fence/walls, and landscaping. Renovation of the existing 6,000 square feet maintenance shed is included. The time of completion for the Maintenance Building - Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion. Clarification/Question Deadline August 9, 2022 @ 5 :00 p.m. Addenda Posted (Final) August 12, 2022 Clarification/Question Deadline September 23, 2022 Addenda Posted (Final) September 27, 2022 1st Evaluation Meeting October 17, 2022 @ 3:00 p.m. 2nd Evaluation Meeting (if needed) October 18, 2022 @ 3:00 p.m. Ranking Posted October 17 or 18, 2022 Ranking & Approval to Negotiate with Top Ranked Firm to BOD November 1, 2022 Contract Negotiation/Development November 2, 2022 through November 18, 2022 Recommendation to Award & Contract to BOD for approval December 6, 2022 The time of completion for the Maintenance Building – Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion

Final Planning

Transportation Terminals

$3,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
70
Bidding Soon
1,220
All Active Projects
536
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2022

December 6, 2022

img_map_placeholder

1200 Red Cleveland Blvd, Sanford, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.