BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a water / sewer project in Huntington Beach, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Engineer's Estimate for this Project is $129,000,000. The project consist of replacing the aging A-Side facilities and to take advantage of potential operational and cost benefits resulting from new clarifier cover design configurations and advancements in odor technologies. The overall P2-98 project is to rehabilitate or replace facilities in the primary treatment system at Plant No. 2 without a change in the overall plant rated treatment capacity. The primary treatment system at Plant No. 2 consists of fourteen circular clarifiers and associated influent piping, influent distribution structures, effluent piping and sludge pumping units. The clarifiers are covered with geodesic domes that contain the foul air from the clarifiers for conveyance to and treatment at two foul air scrubbing complexes. The primary treatment facilities were built between 1960 and 1985. The units are experiencing varying degrees of deterioration due to corrosion and need rehabilitation or replacement based on physical condition, level of performance, and age. The work consists of general site work, construction of four new Primary Clarifiers and Primary Sludge Pump Stations, construction of the new APSC (A-Side Primary Scrubber Complex), construction of the new Distribution Center F (DC-F), construction of the new Junction Boxes and Distribution Structure A (DS-A), necessary temporary facilities to complete the work and the demolition of existing structures to allow construction of the new project facilities. Addendum #1 & #2 have been issued. Temporary facilities include bleach station, temporary red-feed of power, Motor Control Center (MCC), plant water strainer, utilities, site dewatering, and shoring. The demolition work includes the existing A-side primary clarifier facilities, yard piping, odor treatment complex (south scrubber complex), tunnels, Power Distribution Facility (PDF) building (structure only), Power Building A, the temporary facilities, and hazardous materials.

Award

Water / Sewer

$111,405,880.00

Public - County

Renovation, Site Work

1830

137

4508

9

Subscribe For Documents

126 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
114
Bidding Soon
2,448
All Active Projects
1,090
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2021

June 1, 2021

img_map_placeholder

22212 Brookhurst St, Huntington Beach, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.