Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2021 at 7:00 PM
Updated August 22, 2024
Demolition, new construction and renovation of a mixed-use development in Toronto, Ontario. Conceptual plans call for the renovation of a educational facility; for the construction of a 30-story above grade multi-residential development; and retail development.
Ryerson is exploring options to demolish the existing buildings at 101-111 Gerrard St E and redevelop to maximize the potential development density of the property; the scope will include public realm improvements and connections to other existing buildings. The site would be developed for academic teaching spaces, administration, zone education needs, administrative and financial support functions, student residences and street related retail. The scope could include an institutional podium with retail/services at grade and a 30 storey residential tower above. TIMELINE: Request For Prequalification from prospective proponents for the design and development of three potential development sites was followed separately and closed late summer, 2017. No projects resulted from this call. Coverage of this report is discontinued. The method of contractor selection has not been determined at this time.
Project Abandoned
Multi-Residential
Public - City
Demolition, New Construction, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2021
101 Gerrard St E, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
Bid Date: Sep 25 2024
Toronto, ON
Bid Date: Sep 12 2024
Toronto, ON
Bid Date: Sep 18 2024
Toronto, ON
Bid Date: Mar 03 2025
Toronto, ON
Bid Date: Oct 01 2024
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Dec 10 2020
Toronto, ON
Bid Date: Sep 05 2024
Toronto, ON
--
Toronto, ON
Bid Date: Sep 10 2024
Toronto, ON
Bid Date: Sep 23 2024
Toronto, ON
Bid Date: Sep 11 2024
Toronto, ON
Bid Date: Oct 04 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
