Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Gilbert, Arizona. Completed plans call for site work for a water / sewer project.
The proposed project will consist of waterline replacements within the Tankersley North and the Tankersley South areas. Exhibit 1 illustrates the North and South areas and their Land Uses per the Maricopa County Assessor. Tankersley North is generally bound by Frye Road to the north, Higley Road to the east, Pecos Road to the south, and Greenfield Road and Santan Village Parkway to the west. The majority of this portion of the project lies within a Maricopa County island. Tankersley South is generally bound by Pecos Road and Mercy Road to the north, Greenfield Road to the east, Germann Road to the south, and Coronado Road (156th Street) to the west. This portion of the project falls within the Town of Gilbert. The Town of Gilbert seeks a qualified Project Management/Construction Management (PM/CM) firm experienced with Construction Manager at Risk (CMAR) project delivery to provide, PM and CM design phase and construction phase services for the WA1180 Tankersley Waterline Replacement (Area 1 -North) project. The subject property area boundaries are generally described as follows: Tankersley Area 1 (North) - bounded by Frye Road on the north, Greenfield Road on the west, Higley Road on the east, and by Pecos Road on the south Construction will include but is not limited to replacement and upsizing of existing infrastructure, replacement and/or abandonment of existing water pipelines, installation of new 8-inch and larger water pipelines, residential water services and meters. Specific services will include but are not limited to: 1. Design & Construction Phase Progress Meetings. 2. Existing document review, site review assessing proposed and existing facilities, service area survey, flow testing and pressure monitoring analysis as applicable. 3. Permitting Assistance. Agency and utility location coordination. 4. Water meter and water service relocation/installation coordination with Landowners and or Homeowners. 5. Public Information, Outreach, Land/Home Owner Water Service Installation including CMAR coordination meetings. 6. Land, Easement, Temporary Construction Easement Acquisition and Right of Entry Agreement tracking and coordination 7. Design milestone progress Construction Cost Estimates. 8. Prioritization of project work items in terms of construction costs and sequencing/phasing. 9. Recommendations regarding schedule/project budget/GMP at milestone progress submittals and Final Approved Construction Document submittals. 10. Assist in CMAR GMP Development through cost reviews and recommendations. Construction start: 2020 Construction completion: 2021 One (1) original and six (6) paper copies of the SOQ, together with one (1) electronic copy on a USB flash drive as a single .pdf document that is PC readable, labeled and not password protected, must be submitted in a sealed envelope clearly marked: SOQ for PM/CM Services: Project Name: Waterline Replacement - Tankerlsey, CIP Project Number: WA1180, Contract Number: 319001230. Questions may be directed in writing submitted via E-MAIL ONLY to Brad Richards, PE,Gilbert Civic Center, Town Hall Administration Building, 90 East Civic Center Drive, Gilbert, Arizona 85296. Questions must be received by 14 calendar days prior to SOQ due date so that response may be posted as an addendum to the RFQ. Email: Bradley.Richards@gilbertaz.gov All questions must be received in writing via E-MAIL ONLY by GILBERT CONTACT no less than fourteen (14) calendar days prior to the SOQ submittal due date.
Post-Bid
Water / Sewer
$3,395,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock Winning Bids!
Elevate your business with the premier source for commercial construction data. Gain instant access to up to five free projects and companies, and discover a treasure trove of opportunities. Subscribe now for comprehensive access to all contacts, documents, and vital details, and set yourself up to win more business than ever before!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
August 27, 2019
October 28, 2019
To Be Determined, Gilbert, AZ
Related To This Project
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Mar 28 2024
Gilbert, AZ
Bid Date: Mar 28 2024
Gilbert, AZ
Bid Date: Oct 21 2021
Gilbert, AZ
Bid Date: May 11 2021
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Mar 11 2024
Gilbert, AZ
Bid Date: Jul 15 2020
Gilbert, AZ
Bid Date: Feb 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--