BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Foster City, California. Conceptual plans call for site work for a playground / park / athletic field.

Implement a complete park renovation including: • Design and install new ADA compliant playground areas. (Funding is available in the Equipment Replacement Fund for the purchase of playground equipment.) • Upgrade picnic area with shade structure and barbecue. Shade structures enhance community and expand the use of the City’s valuable parks by creating comfortable gathering spaces that are cooler in summer and protected from the sun’s ultraviolet rays and the elements year-round. • Add a 2’ to 3’ concrete curb/retaining wall along the perimeter of the beach and pathway to contain the sand away from the pathway. • Based on the scope of the work and complexity related to ADA issues and requirements., engage a professional landscape architect to add and upgrade landscaping throughout the site. Estimated Project Schedule: Design: FY 2027-2028 Construction: FY 2027-2028 This project is included in the City of Foster City's Preliminary 2023-2024 Capital Improvement Plan (CIP). As of October 4, 2023, design and construction is anticipated in 2027-2028.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$3,810,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,746
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

img_map_placeholder

Gull Ave, Foster City, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.