Published August 15, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Reading, Ohio. Completed plans call for site work for a water / sewer project.

As of August 15 2022 there is an awarded bidder. ACC. NO. 78351 The project is intended to reduce combined sewer overflows as CSO 513 by diverting stormwater to a total of approximately 7100 linear feet (LF) of storm sewer in various diameters, 48 manholes, several catch basins and other inlets, two stormwater outfalls, and other sewer appurtenances in two separate alignments. In addition to storm sewer installation, the project will include asphalt and concrete pavement and removal, management of contaminated soils, removal and/or abandonment of existing sewer lines, and relocation of existing utilities. This project is in the City of Reading, Hamilton County, Ohio 45215 The estimated cost of construction for this project is: $7,640,100.00 Questions on this project or any part of the contract documents and other project documents Must be sent via e-mail to msd.Procurement@cincinnati-oh.Gov by the established Deadline. The deadline for questions is 12:00 pm local time on wednesday, june 15, 2022. The established SBE Participation Goal for this project is: 6%. Bidder is required to complete and submit the SBE Goal Compliance Plan Cover Page with bid. If the SBE goal will not be met, the bidder shall also complete and submit the Waiver Request Form and Affidavit, and the SBE Subcontractors Good Faith Efforts (GFE) Summary Sheets with the bid. To be eligible for award of a contract or procurement when the SBE goals will not be met, the bidder must complete all SBE Subcontractors GFE Summary Sheets to support the Waiver Request Form and Affidavit areas checked. Failure to complete and submit required documentation may cause a bid to be rejected as non-responsive. Bids must be submitted in accordance with the Contract Documents and must be accompanied by the Bid Guaranty and Contract Bond, certified check, or letter of credit drawn on a solvent bank in an amount not less than ten percent (10%) of the bid amount, and in no event shall be less than five hundred dollars ($500.00). Bidder shall also submit a completed Addenda Acknowledgment Form with the bid. In addition to other documents, after the Bid Opening and upon notification, the apparent lowest and best bidder will need to obtain proof of Workers Compensation coverage and a certificate of insurance within ten (10) business days, naming the City as the primary insured and the Hamilton County, Ohio Board of County Commissioners as an additional insured. See the Contract Documents, including but not limited to the Modified General Conditions, for further certificate of insurance requirements and limits of liability. The Date for Substantial Completion of the Contractor Work will be 500 days after the Date For Commencement. The Date for Final Completion of the Contractor Work will be 90 days after the Date For Substantial Completion. The Date for Final Completion shall only be changed or modified by Change Order, other Modification, or a Claim that is Finally Resolved regardless of any dates in any schedules, including the Construction Progress Schedule, created by any person, including the Contractor.

Award

Water / Sewer

$6,728,010.00

Public - City

Site Work

38

21

8

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining, Tunnel Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Water Drains, Utility Area Drains
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
79
Bidding Soon
1,292
All Active Projects
550
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2022

September 20, 2022

img_map_placeholder

West St, Reading, OH

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

CSO 513 Partial Sewer Separation - Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.