BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 7, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Dallas, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The Project Consists of Replacement of the Existing Single Span Concrete Encased Steel I-beam Bridge Carrying Sr 1014 (Overbrook Rd) Over Sr 309 (Memorial Highway) With Approach Roadway Improvements. The Proposed Structure Will Be Single Span Prestressed Concrete Adjacent Box Beam Bridge With Two 11 Foot Lanes and 8 Foot Shoulders. Other Work Includes Roadway Approach Pavement Reconstruction and Shoulder Widening, Guide Rail Replacement, E&s Control Measures, Temporary Traffic Control, Signing and Pavement Marking, Structure Removal, and Other Miscellaneous Construction Work. Construction of the Sr 1014 Bridge Will Be Completed While Traffic is Detoured. In Addition to the Bridge Replacement Work on Sr 1014, There Are Proposed Improvements to the Sr 309 Corridor Underneath the Structure Including Mill and Overlay, Full Depth Paving and Permanent Soil Nail Slope Construction Using Staged Construction. The Roadway Shoulders Will Be Increased to 5' on Both Sides and the Roadway Profiles of Both Sr 1014 and Sr 309 Will Be Adjusted to Meet Vertical Clearance Requirements as Indicated on the Approved Drawings Included in the Bid Package for State Route 1014, Section 370, in Luzerne County, Dallas Township From Approximately 2.1 Miles West of Huntsville at Segment 0050 Offset 0488 to Approximately 0.3 Miles East of Fern Brook at Segment 0050 Offset 1198. Project Cost Range: $7,500,000.00 - $9,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 42.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 1014 Overbrook Over SR 309 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$9,999,999.00

Public - State/Provincial

Paving, Renovation, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
143
Bidding Soon
2,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

October 19, 2026

Project location map

Overbrook Ave, Dallas, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.