Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 20, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a road / highway in Kelso, Washington. Design plans call for site work for a road / highway.

STIP ID 400018N08 The breakaway cable terminal (BCT) design does not meet NCHRP 350 specifications, and has been identified for active removal since 1994. This project will complete the work identified earlier and replace these devices before they are hit and the device fails to act as they were intended. Replacing them will increase the safety of the motoring public and reduces the risk to the agency. As of February 20, 2023, this project is in a design status. Preliminary engineering has begun and environmental design is expected to be complete in the first quarter of 2018. The contract advertisement is expected in fourth quarter 2023 and construction is anticipated to be operationally complete in the second quarter of 2024. WSDOT - SWR Breakaway Cable Terminal Replacement - Non-Interstates *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$423,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
56
Bidding Soon
1,514
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

Project location map

Multiple Locations, Kelso, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed