EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Lake Forest Park, Washington. Completed plans call for site work for a bridge / tunnel.

Removal of the existing culvert and other obstructions and replacing with a fish passable structure. 67 working days. Involves 160 items. Work class 1. A federally funded contract with a 20% condition of award disadvantaged business enterprise goal. County King County Estimated value $6,000,000 - $7,000,000 Bid opening meeting Join Team Meeting --->>> Link in bid open description or dial in +1 (206) 531-0324 Access Code 524-008-947# (available 10:30 a.m. on bid day - bids opened after 11:00 a.m.) WA DOT - SR 104, Lyon Creek Fish Passage WSDOT does not believe the tanks are full. However, it is unknown if the tanks are completely empty. Please Bid this how you see it. WSDOT does the fish exclusion with the help of the Contractor as needed. See Standard Specification 8-31.3(3) and Page 134 of the Contract Provisions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of Work 1.Removal and disposal of a one-story commercial building (approximately 1,813 sq. ft.). 2. Removal and disposal of an existing concrete building foundation (slab), backflow preventer slab, hydraulics lifts (quantity: 2). 3. Removal and disposal of all abandoned property remaining on-site and not 44 listed herein. 4. Decommissioning sanitary sewer and water lines as described in this Special Provision. 5. Removal and disposal of cement concrete pavement (approximately 1,200 50 sq. ft.) located above the existing USTs. 6. Removal and disposal of asphalt concrete pavement (approximately 5,250 3 sq. ft.) adjacent to the building. 7. Removal and disposal of two 10,000-gallon USTs and associated piping and apparatuses. 8. Adherence to all regulatory requirements outlined in this Special Provision. 9. Any other requirements outlined in this Special Provision.

Bid Results

Bridges / Tunnels

$5,989,739.00

Public - State/Provincial

Site Work

108

20

126

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
69
Bidding Soon
992
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

July 1, 2025

img_map_placeholder

WA-104, Lake Forest Park, WA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 104, Lyon Creek Fish Passage

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.