BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2024 at 8:00 PM

Updated August 9, 2024

Site work and paving for a road / highway in Alameda, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Update : https://www.alamedaca.gov/files/content/public/v/2/departments/public-works-department/delivering-on-resiliency/2023-25-capital-budget-project-sheets-final.pdf The Central Avenue project, which totals 1.7 miles and is partially on State Route 61, improves safety and mobility for all street users including people who walk, bicycle, take the bus or drive. The project reduces lanes from four to three, and includes a center turn lane, a two-way separated bikeway adjacent to schools and on the SF Bay Trail, standard striped bike lanes in the Gold Coast area between Eighth Street and Sherman Street, roundabouts at Central/Main Pacific, Central/Third/Taylor and Central/Fourth/Ballena, curb extensions, pedestrian refuge islands, traffic signal modifications, flashing beacons by Encinal School at Lincoln Avenue, new crosswalks, enhanced bus stops, street trees and stormwater gardens. A fourth roundabout at Central/Sherman/Encinal is unfunded. Project is included City of Alameda FY 2023-2025 Page No 36 --------------------------------------------------------------------------------------------------------------------------------------------------- The Central Avenue project, which totals 1.7 miles, is between Main Street/Pacific Avenue and Sherman Street/Encinal Avenue. It improves safety for all street users including people who walk, bicycle, take the bus or drive. The project reduces lanes from four to three, and includes a center turn lane , a two-way separated bikeway adjacent to schools and bike lanes in the Gold Coast area between Eighth Street and Sherman Street, curb extensions, pedestrian refuge islands, traffic signal modifications, rectangular rapid flash beacons, new crosswalks, enhanced bus stops, street trees and rain gardens. The work also includes roundabouts: at Main Street/Pacific Avenue/Central and at Third/Taylor/Central. Two additional roundabouts (pending funding) are planned at Fourth/Central and Sherman/Encianal/Central. The total expenditure for the Caltrans required project initiation document effort is not to exceed $557,000. The subsequent analysis for the Webster Street/Central Avenue intersection, environmental review and design is budgeted for $2,000,000. Construction is budgeted for $12.2 million. Total project costs: $15,257,000. Per the owner, as of June 27, 2022, a design team has been selected. The owner states that they have not yet selected a general contractor. Owner states that construction is anticipated in early/mid 2023.

Post-Bid

Roads / Highways

$15,525,000.00

Public - City

Paving, Site Work

281

5

76

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
176
Bidding Soon
3,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 16, 2024

Project location map

Central Ave, Alameda, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.