BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a military facility in Alameda, California. Completed plans call for the renovation of a military facility.

SCOPE OF WORK: Provide all labor, materials, tools, equipment, transportation, field survey, verification, inspection, disposal, testing services, and supervision necessary to replace existing package air conditioning unit with new heat pump and replace existing split heating and air conditioning systems with new systems in Building 50 and 51 at Base Alameda. The work includes, but is not limited to, the following: A. Remove and dispose of (8) existing packaged heat pumps. Install (8) new packaged heat pumps with economizer at the location of removed heat pump. Connect heat pump to existing supply and return duct with new flex connections. B. Remove and dispose of (4) ductless split heating and air conditioning systems. Install (4) new ductless split system at the location of removed split systems. Insulate and support the new refrigerant pipe. C. Remove and dispose of (6) split heating and air condition systems with ducted fan coil. Install (6) split heating and air conditioning systems with ducted fan coil at the location of removed split systems. Insulate and support the new refrigerant pipe. Connect split system to existing supply and return duct with new flex connections and air filter housing. D. Provide new wired 7-day programmable thermostat and control wire to new HVAC equipment. All exposed control wire shall be in conduits. No wireless thermostat will be consider. E. Provide electrical power to the mechanical equipment. F. Open existing variable air volume (VAV) and by-pass dampers and remove VAV room thermostats. G. Provide and install mechanical equipment identification marker tags on new equipment installations. H. Contractor shall fill in all required data for new equipment enrollment form. The data shall include, but not be limited to, manufacturer name, model number, serial number, install date, purchase price, warranty expiration date, and equipment 17167651 Page 2 description. See Appendix A for the new equipment enrollment form. Contractor shall submit the completed enrollment form to CG for review. The Contractor shall prosecute the work diligently and complete the entire work not later than two hundred (240) calendar days after receipt of Task Order.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
89
Bidding Soon
1,843
All Active Projects
773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

July 27, 2022

img_map_placeholder

42 Eagle Rd, Alameda, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.