BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2025 at 7:00 PM

Updated January 9, 2025

Site work and renovation of a civil project in Huntington, New York. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project formerly known as Huntington Station Hub - 8195. As of November 18, 2024, this project has been released for general contractor bidding. The installation of the extension of the Walt Whitman Pump Station force main from a manhole near the intersection of Old Country Road and New York Avenue to a manhole at the intersection of Corporate Drive and Maxess Road in the Town of Huntington. This will include the crossing of the Long Island Expressway. The following is a summary of the work: 1. Installation of approximately 10,800 LF of 10-inch HDPE force main, complete with all necessary manholes and appurtenances. 2. Installation of approximately 400 LF of the force main using trenchless technologies for the Crossing of the Long Island Expressway at Old East Neck Road. 3. Installation of the force main will include but is not limited to providing complete utility mark out and test holes as required, work zone traffic control, tracer wire, testing, road restoration and all permitting. 4. Replace the existing air release/ vacuum system with new combination air release/ air vacuum valves on existing force main. 5. Obtain approvals for construction from all agencies having jurisdiction including the Town of Huntington, NYS DOT, and Suffolk County of Public Works. 6. Prepare redlines as work progresses and as-built drawings at the completion of the job. The notice to proceed is expected to be issued in April 2025 with construction expected to start late Spring 2025. Construction is expected to take two years to complete. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. Questions for user login should be directed to the Suffolk County Department of Public Works IT division at (631) 852-4115. Eligible bidders must have registered on the Suffolk County Department of Public Works Purchasing Unit web site to be eligible to submit a responsible bid. Any questions regarding this project shall be directed to Adriana Restrepo, P.E. via email at Arestrepo@dbeng.com and cc Janice McGovern, P.E. (Chief Engineer) at Janice.Mcgovern@suffolkcountyny.gov.

Post-Bid

Water / Sewer

$30,000,000.00

Public - County

Renovation, Site Work

83

29

9

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
879
Active Projects
473
Bidding Soon
6,956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

June 9, 2025

Project location map

Multiple Locations, Huntington, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.