BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Demolition, site work and new construction of a bridge / tunnel in Beaver Falls, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The scope of this project includes, but is not limited to, the following: demolition, site work and new constriction of a bridge/tunnel. As of October 13, 2025, this project is still in design phase. As per the owner the project does not have funding secured and best-case construction would start in 2025. Construction is expected to take at least 9 months. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Award

Bridges / Tunnels

$150,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
134
Bidding Soon
2,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

To Be Determined, Beaver Falls, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.