BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2019 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Thompson Falls, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; pre-engineered storage facility; and water / sewer project.

The project consists of constructing a common floor/top load class II solid waste transfer station facility. The upper level consists of a concrete tipping floor enclosed within a metal building and the lower level consists of a tunnel which accommodates a top load transfer trailer. The project will also require the construction of a heated shop building. Other site improvements include excavation, embankment, roadway construction, stormwater controls, fencing, landscaping, and utilities.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$3,742,204.00

Public - County

Paving, Site Work

102

36

7

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
10
Bidding Soon
186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2019

April 29, 2019

Project location map

To Be Determined, Thompson Falls, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.