BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Whittier, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 10/20/2020 project was not yet been awarded. Anticipated award date is on 11/10/2020. For specific information on the project, please contact Civil Engineering Assistant, Isaac Bravo, at (562) 567-9518 The Whittier Greenway Trail East Extension Gap Closure Project (WGTE) will construct a pedestrian/bicycle trail approximately 2.8 mile in length on a City owned 15 foot easement on Union Pacific Railroad (UPRR) property adjacent to an active rail line. The project will include AC pavement, wire-mesh fencing, two prefabricated bridges, irrigation, planting, soil remediation, and concrete work. The WGTE project is an Active Transportation Project (ATP) and is funded by Federal, State, and Local funds. This project is subject to "Buy America" requirements and Disadvantaged Business Enterprise (DBE) requirements. The successful bidder will obtain a Right-ofEntry agreement with Union Pacific Railroad and coordinate proper flagging and safety requirements for the duration of the project. Additionally, the construction of the Greenway Trail Project will have signal work at seven (7) intersections from Mills Avenue to 1 st Avenue in the City of Whittier. Signal work is to be done by others but must be coordinated due to overlapping sequencing of both project scopes of work. Lambert Road TSSP plan sets are included as reference for coordination. female utilization is 6.9 percent. Minority utilization 28.3%

Award

Roads / Highways

$8,124,983.00

Public - City

Paving, Site Work

318

1

13

7

Subscribe For Documents

144 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
2,271
All Active Projects
1,016
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2020

December 2, 2020

img_map_placeholder

The Whittier Greenway Trail, Whittier, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.