BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Concord, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 19, 2021, an engineer has been selected for the project. Bidding is estimated to take place in 2022 and construction is estimated to take place in 2023. *The closed solicitation has been included below for reference: Willow Pass Road Repaving: $4.5M- $5.0M Willow Pass Road Safe Route to Transit: $700,000- $800,000 No proposal will be accepted from or contract awarded to any person, firm, or corporation that is in arrears; or is in default to the city upon any debt or contract; or that is a defaulter, as surety or otherwise, upon any obligation to the CITY; or has failed to faithfully perform any previous contract with the city. the CITY; or has failed to faithfully perform any previous contract with the City. The civil engineering design services to be performed consist, in general, of preparing PS&E for the following projects: The Willow Pass Road Repaving Project will rehabilitate the pavement and repair damaged sidewalk, curb and gutter on Willow Pass Road between Galindo Street and San Vincente Drive. Additionally, existing non-ADA compliant curb ramps will be replaced to meet current ADA standards. The Willow Pass Safe Route to Transit project closes two sidewalk gaps and enhances an uncontrolled multi-lane pedestrian crossing on Willow Pass Road in eastern Concord. The sidewalk gap closures will provide ADA-compliant access to multi-family housing, bus stops, markets, Wren Elementary School and other amenities. The project includes the replacement and relocation of an outdated pedestrian warning system with a pedestrian hybrid beacon across Willow Pass Road at San Vincente Drive to connect residences to these amenities. If you are interested in submitting a Proposal, carefully review the information in the RFP and prepare a Proposal according to the instructions provided. For information regarding the project, contact Mark Migliore, PE, (925) 671-3422. The Method of Contractor Selection has not been determined at this same time.

Post-Bid

Roads / Highways

$5,800,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
89
Bidding Soon
1,882
All Active Projects
777
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

img_map_placeholder

Willow Pass Rd, Concord, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.