Published December 23, 2019 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Toledo, Ohio. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work to be performed under this Contract generally consists of construction of water treatment facilities upgrades to rehabilitate the main piping galleries and filters of the existing East and West Plants. The principle work includes: For all Filters 1 through 30 Rebuild existing filters and convert to biologically active filters with sand and granular activated carbon media.o Install new air scour piping valves, and controls. Install new piping, valves and electrically operated motor actuators on the filter to waste piping complying with current OEPA backflow protection guidelines.o Replace the filter influent, drain and washwater valves and electric motor actuators. Replace the sample ports on filter effluent piping. Replace corroded bolts on pipe flanges and fittings.o Repair joints where leaking on existing filter rate of flow controllers.o Repair joints where leaking at floor and wall castings.o Replace main pipe gallery sump pumps. Demolish and remove existing surface wash piping, valves, actuators, pumps and related control systems. The filter headloss, differential pressure cells, turbidimeters, and related piping are to remain. Install new air scour supply system for the west plant filters consistent with Basin 7 & 8 improvements including: Addition of two (one duty, one stand-by) new, positive displacement blowers with variable frequency drives.Collins Park Water Treatment Plant Filter and Pipe Gallery Improvements 00020-2 Project No. 23509 Version: October 10, 2019 New thermal mass flow meter in the blower discharge piping to be used for blower control. Building addition to the west of filter #19 to house the new blowers. Replace washwater piping from the south wall of the Chemical Building basement to the vertical bend located downstream of the west plant washwater rate of flow controller. Install manually operated butterfly valves in the basement of the Chemical Building for providing isolation for main plant wash water and the wash water to the east plant. Replace the washwater rate-of-flow controllers for both the east and west plants. Remove and replace the existing plant water piping and valves in the Chemical Building basement, Basins 1-6 Main Galleries, Basins 1-2 Side Gallery, and connect to existing piping installed with the West Plant Backup Backwash and Plant Water System Improvements project.Remove existing 7200 volt concrete encased conduit and cable bank in the west plant chemical building hallway. Site improvements consisting of grading and drainage, and storm piping modifications in the vicinity of the proposed blower addition, and appurtenances. The following contractors have been prequalified to bid this project: 1. Kokosing Mosser Joint Venture 2. Shook Construction Company 3. Walsh Construction Bids Will Only Be Received From the Pre-qualified Companies as Listed Online Q&A Deadline: December 4, 2019 5.00 PM(Eastern)

Bid Results

Water / Sewer

$33,537,735.00

Public - City

Renovation, Site Work

1

17

246

6

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
117
Bidding Soon
1,428
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2019

February 13, 2020

img_map_placeholder

3040 York St, Toledo, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Filter and Pipe Gallery Improvements - For Subcontractors

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.