Site work and renovation of a water / sewer project in Leonard, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

No mandatory pre-bid meeting will be required for Solicitation Set #5, however the CMAR team will require all companies to submit a signed Intent to Bid Document no later than at 5:00 p.m., prevailing time on August 28th, 2018 Garney Companies, Inc. invites you to propose on Solicitation Set#5 Leonard Water Treatment Plant Bid Packages. Solicitation Set #5 focuses on CMAR-3 (Garney Companies, Inc.) project at the Leonard Water Treatment Plant in Leonard, TX. *PLEASE NOTE THE SAME DRAWINGS AND SPECIFICATIONS (DIV 01-44) USED FOR SOLICITATION SET#4 WILL BE USED FOR SOLICITATION SET#5* Solicitation Set#5 will consist of the following Bid Packages: BP#5.1 - Chemical Building Shell Package BP#5.3 - Pre-Treatment Structural and Mechanical Package BID PACKAGE 5.3 -Pre-treatment Structural and Mechanical Package- Solicit and obtain a contractor to furnish all labor, equipment, and materials needed to complete the structural, architectural, and process mechanical construction of the Pre-Treatment structure. Contractor will be responsible for dirtwork, underslab process piping, plumbing, sleeves, concrete, misc metals, embeds, precast concrete, structural steel, roofing system, and all structural items for a complete structure, all above ground process piping, hydrostatic testing, tie-ins, above ground process piping, and equipment install and testing for a complete and operational system. This package excludes Electrical, I&C, procurement of the sludge collection system, plate settlers, and pretreatment vertical shaft mixers (CMAR Procured). The site address has yet to be official addressed, but can be located at 361 Co Rd 4965 Leonard, TX 75452 roughly. No access to the site will be allowed unless permission is formally requested and granted, but you are free to drive near the area to get a visual of the project location. Construction of the whole project began on June 6, 2018. Construction of this solicitation set began November 2018. *See associated projects for additional bid package information. *The project value listed reflects the total project estimate.

Under Construction

Water / Sewer

$320,000,000.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
2
Bidding Soon
2,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2018

November 12, 2018

Project location map

361 Co Rd 4965, Leonard, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.